Operation Manual for Automatic Rock Machine_News Center Co., Ltd._Tianjin Dongli District Changda Experimental Instrument Factory
欢迎来到Tianjin Dongli District Changda Experimental Instrument Factory!
  • Sales Hotline:13302175388  13302175388


Company Information

Location:Tianjin

会员级别:采商通4

身份认证:    

我的勋章:  通过中商114认证

Business Card

  • 公司名称Tianjin Dongli District Changda Experimental Instrument Factory
  • 联 系 人尹志松 (先生)
  • 公司电话13302175388
  • 手机号码13302175388
  • Company AddressDongli District, Xinli Street, Outer Ring East Road

更多Product Classification Co., Ltd.
  • No Category

更多Contact Information
  • Contact person:尹志松
  • Telephone:13302175388
  • Mobile:13302175388
Home > News Center Co., Ltd. > Operation Manual for Automatic Rock Machine
News Center Co., Ltd.
Operation Manual for Automatic Rock Machine
Publish Time:2022-05-07        View Count:25        Return to List

The automatic rock cutting saw is composed of guide rails, cutting table, rock clamps, transmission gearbox, speed control motor, and an electrical control panel. The main frame is焊接 using various steels, featuring a compact structure, strong rigidity, and excellent stability during operation.

Operation Instructions for Automatic Rock Sawing Machine:

After the machine is installed securely, connect the external power supply to the control box.

2. Check for the flexibility of all parts of the unit and whether any fasteners are loose.

3. Turn on the main power switch; the power indicator light illuminates.

4. Press the "On" button for the cutting blade, observe the rotation direction of the blade and the arrow on the housing. If they are opposite, an adjustment is needed. The other rotating directions of the entire machine are the same as the cutting blade at the time of factory shipment.

Everything is set, and as long as the cutting blade turns correctly, everything should be fine.

5 double-edged blade saws with two sets of sleeves, 50mm and 100mm, are available for use with stone specimens ranging from 50 to 150 cubic or 50 to 150 round. For cutting 50mm specimens, the 50mm sleeve can be used.

For 100mm specimens, use a 100mm sleeve pad; for 150mm specimens, two sleeve pads can be used together.

Ensure a sufficient amount of water is directly sprayed onto the blades.

Prior to loading rocks, run the machine empty for several minutes by sequentially pressing the start button, then re-tighten the blade nuts with a wrench.

8. Depending on the rock shape, utilize different clamping methods to ensure the rock pieces are securely and tightly clamped, preventing any loose or false clamping. This is to avoid the blade being affected during the cutting process due to the rock's movement.

With Rock Yang.

9. Start the cutting motor first, then press the feeding button.

The tachometer indicates the speed of the working feed and return motor. By turning the speed control knob during the feed and return process, the speed of the cutting blade can be adjusted. Based on experience, the speed is generally around 300 RPM when cutting harder rocks. For moderately hard rocks, it's around 600 RPM, and for soft rocks, it's around 900 RPM. The tachometer's scale is marked at 1200 RPM. The data listed here is for reference only and can be adjusted according to the type of rock.

 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13302175388