How to Install and Protect Glass Fiber Reinforced Plastic (GFRP) Fans_News Center Co., Ltd._Shandong Bekeris Machinery Co., Ltd.
欢迎来到Shandong Bekeris Machinery Co., Ltd.!
  • Sales Hotline:13356758620  13356758620


Company Information

Location:Shandong/Weifang

会员级别:数字营销4

身份认证:    

我的勋章:  通过中商114认证

Business Card

  • 公司名称Shandong Bekeris Machinery Co., Ltd.
  • 联 系 人杜民强 (先生)
  • 公司电话13356758620
  • 手机号码13356758620
  • Company AddressNo Chinese content provided.

更多Product Classification Co., Ltd.
  • No Category
Home > News Center Co., Ltd. > How to Install and Protect Glass Fiber Reinforced Plastic (GFRP) Fans
News Center Co., Ltd.
How to Install and Protect Glass Fiber Reinforced Plastic (GFRP) Fans
Publish Time:2022-03-28        View Count:16        Return to List

How to Install and Protect Fiberglass Wind Turbines? When installing wind turbines, it is advisable to follow the methods introduced below to ensure optimal operation of the turbines.

During initial trial operation, the motor is first activated to check if the impeller rotates to the correct target.

2. A 5mm rubber pad is added between the base of the fan and the foundation to reduce vibration. The base bolts should be equipped with a spring washer to prevent loosening during use.

Before adjusting the flow, thoroughly inspect all parts of the fan and ensure that rotating the impeller does not result in any dumb or jamming, scraping phenomena.

4. The foundation of the installation must be higher than the roof, with an orderly exterior to prevent water leakage, and the ground screws need to be pre-buried.

5. During trial runs or normal operation, there should be no unusual differences. Voltage, current, vibration, and noise should all remain within the normal range.

6. During operation, if the following situations are encountered, the machine should be immediately stopped, the cause should be investigated, and the machine can be started again after the issue is resolved.

After a prolonged shutdown, the equipment should be re-inspected according to the adjustment procedures before being put back into normal operation.

8. Begin to circulate 72 hours and check the fan connection and fastening parts for looseness every six months. Adjust to change the tension of the conveyor belt, and add lubricating oil.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13356758620