How to Achieve True "Clean Room" Renovation?_News Center Co., Ltd._Beijing PuHui Construction Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Beijing PuHui Construction Engineering Co., Ltd.

Purification Engineering

Tianzhu Hui Star Member
13810989845
 

News Category
  • No Category

Contact Information
  • Contact person:韩金桃
  • Telephone:13810989845
  • Mobile:13810989845
  • Email:hjt19790@163.com
  • Address:1 Chengguan Street,农林 Road No. 1, Fangshan District, Beijing City
Home > News Center Co., Ltd. > How to Achieve True "Clean Room" Renovation?
News Center Co., Ltd.
How to Achieve True "Clean Room" Renovation?
Publish Time:2023-07-24        View Count:78         Return to List

What to Consider When Renovating a Cleanroom? Renovating a cleanroom is a highly technical field. Unlike our ordinary rooms, cleanrooms require an extremely high level of cleanliness, and some areas also need to meet dust-proof, fire-resistant, thermal insulation, and anti-static requirements. Therefore, a deep understanding of the industry is essential for renovating cleanrooms, as well as a thorough knowledge of the materials used in their construction, to truly achieve a "dust-free" environment.



How to Choose Cleanroom Decoration Materials

One: Water-resistant gypsum board is required.

The moisture content of the wood should not exceed 16%, otherwise it is prone to cracking, warping, and loosening.

The surface of the装修材料exhibits certain chemical resistance.

Four: The decorative materials possess certain oxidation resistance.

Fifth, the shower area features anti-slip ceramic tiles.

Sixth, anti-bacterial wall塑 has a short lifespan, is prone to deformation and bubbling, and represents a low and narrow level of decoration.

Seven: Dust-Free Workshop Decorative Panels: Decorative panels, commonly known as panels, are a high-grade material.

Cleanroom Renovation Construction Requirements

Self-leveling floor treatment, thickness 2mm.

2. In accordance with GMP standards, sealing treatment must be applied to gap areas.

All accessories are securely connected to the main structure, preventing loosening and the shedding of dust.

4. Seams should be sealed on the front side.

5. In compliance with the GMP certification inspection standards:

Select materials with minimal deformation.

b. Walls and ceilings should be smooth and easy to clean. Colors should be harmonious for easy identification of contaminants.

Seams at all junctions must be sealed.

6. Dust generated during operations must be cleaned up at all times.

Room equipped with filters must not have dust-generating operations.

Protect the work surface to prevent defects in the sheet material.

 Click submit means you agree to《Service terms》《Privacy policy》

13810989845