Lifting stage machinery is a common type of stage equipment, and our priority is to ensure its safety. Any installation miscalculations can lead to safety accidents. Let's take a look at the installation process of lifting stage machinery. The specific operations are as follows:
Before assembling the lift platform, you can roughly construct two support legs on the ground.
2. Insert the side tension rods into the pins on the leg stand device, without a check valve.
3. Insert the platform bracket into the U-shaped slot above the support leg, completing the assembly of one set of stands.
4. Place one leg side by side.
5. Then, connect two diagonal rods to the original support leg and secure it in place.
6. Next, lay the frames flat, with the two frames sharing a single leg in the center, and place them into the U-shaped槽.


