Cleaning school septic tanks and canteen grease traps

Prior to construction, it is essential to compare the drawings provided by the client, conduct on-site surveys, and confirm.Septic TankQuantity of and other related equipment.Confirm the daily work schedule and personnel assignments. Preparation of the "Daily Safety Inspection Checklist" prior to construction, to be completed at the start of each workday. The general checklist typically includes the following:
① Personnel; ② Cleaning equipment and maintenance status; ③ Accessories, hoses, soft jet nozzles, and hard jet nozzles; ④ Nozzles; ⑤ Worksite. Adhere to the manufacturer's provided maintenance, operation, and braking manuals; inspect the wear on hoses before operation and test for leaks. Damaged hoses should be replaced. After contact with wastewater or other effluents, all equipment should be cleaned to ensure that wastewater does not contaminate public or water supply environments.