Fence Setting Standards: Construction sites must be surrounded by continuous and enclosed fences in accordance with regulations. For multi-story or high-rise buildings, safety protection facilities should also be installed. Fences set on main urban roadways, scenic landscape roads, and in airports, ports, and train station plazas must be at least 2.5 meters high. For fences on other road sections, they must be at least 1.8 meters high. Municipal engineering project sites may set fences in sections according to the progress of the project or use a uniform continuous barrier system.
The Selection of Hoarding Materials: The materials used for hoarding should be sturdy, clean, and aesthetically pleasing. Contractors are prohibited from placing construction materials, waste, or construction debris outside the perimeter fence of the site. In areas temporarily occupied with approval, materials or machinery should be stored or unloaded strictly within the approved area and usage nature, and a fence higher than 1 meter should be set up around the temporary area.
Promotional Slogan: On construction sites where conditions permit, visible promotional slogans reflecting the spirit of the enterprise and the style of the times can be displayed on perimeter walls, dormitory facades, and other locations.
Safety Measures: When inquiring at stores, consider the safety protection features of enclosures, such as high-speed railway guardrails, razor wire, regular barbed wire, steel mesh, Dutch mesh, etc., to ensure construction site safety.
Custom Services: For customized construction hoarding, please contact us for a tailored solution, including various sizes and color options to meet the specific requirements of your project.
Following these key points ensures the safety and standardization of the construction and installation of Hebei's grass barrier, while also meeting the aesthetic requirements of the project.