Our company has signed the Xuzhou Tongze 110kV Substation Rainwater Harvesting Project._Engineering Achievements Co., Ltd._Nanjing Pinlan Environmental Protection Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Nanjing Pinlan Environmental Protection Equipment Co., Ltd.

Environmental protection equipment manufacturing, environmental protection en...

Consultation Hotline
02557117698   13813354453

News Category
  • No Category
Home > Engineering Achievements Co., Ltd. > Our company has signed the Xuzhou Tongze 110kV Substation Rainwater Harvesting Project.
Engineering Achievements Co., Ltd.
Our company has signed the Xuzhou Tongze 110kV Substation Rainwater Harvesting Project.
Publish Time:2023-01-13        View Count:15        Return to List

Our company has signed a contract with Xuzhou Tongze.110 kV Substation Rainwater Harvesting Project

Project Description:Xuzhou TongzeNew 110kV Substation Construction Project. Located in Li集镇, Suining County, Xuzhou City, the project includes the establishment of an integrated precast pump station. The pump station is made of GRP high-strength fiberglass and equipped with a 4G remote control unit. It features dual-power switching, soft start, and operates via remote PC and mobile control, achieving unattended operation and automatic control. Our company is responsible for the supply of complete sets of equipment.

Contracting Party:Pizhou City Construction and Installation Engineering Co., Ltd.

Supply Content:Integrated precast pump station and complete electrical control equipment supply


 Click submit means you agree to《Service terms》《Privacy policy》

02557117698