High flow, low head, WQ series submersible sewage pump, precision craftsmanship_SupplyPro Co., Ltd._Jining Antai Mining Equipment Manufacturing Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Jining Antai Mining Equipment Manufacturing Co., Ltd.

Mine-use explosion-proof submersible pump, Factory-use explosion-proof submer...

Consultation Hotline
18653770993  18369737998

News Center Co., Ltd.

Product Categories

Contact Information
  • Contact person:郗来粉
  • Telephone:18653770993
  • Mobile:18369737998

Home > SupplyPro Co., Ltd. > High flow, low head, WQ series submersible sewage pump, precision craftsmanship
High flow, low head, WQ series submersible sewage pump, precision craftsmanship
品牌: Anlitai
Traffic: 100
Head Lift: 60
Power: 30
单价: 3600.00/Tai
最小起订Quantity: 1 Tai
供货总Quantity: 20 Tai
有效期至: 长期有效
最后更新: 2025-09-03 11:53
 
详细Info


     

Preparation Before Installation**

Environmental Inspection

- Confirm that the installation environment meets explosion-proof requirements (such as gas concentration, dust grade), ensuring no accumulation of flammable or explosive gases.

- Verify that the well or pond's depth and diameter match the pump size to prevent inadequate heat dissipation or mechanical collisions due to insufficient space.

-Clear out silt, gravel, and other debris from the well bottom to prevent clogging of the inlet or wearing of the pump body.


2. **Equipment and Accessories Inspection

- Verify the pump nameplate parameters (voltage, power, explosion-proof grade, etc.) match the application scenario, ensuring the equipment complies with national explosion-proof certification (e.g., Ex d I Mb).

- Inspect that all accessories such as cables, seals, and bolts are complete and undamaged, and that the explosion-proof joints are free of scratches or rust.


---


### **Section II: Key Points During Installation**

Power and Cable Handling

- Utilize dedicated explosion-proof cables; the outer sheath of the cables must possess tensile strength, wear resistance, and corrosion resistance.

- Cable connections must be completed through a ** explosion-proof junction box ** to ensure a tight seal of the joints, preventing moisture or gas from渗入.

- The grounding wire must be connected separately to a reliable grounding device, with a grounding resistance ≤ 4Ω to avoid the risk of leakage.


2. **Pump Mounting and Sealing**

- Vertical lifting of pump using stainless steel chains or corrosion-resistant slings, with an inclination angle ≤ 3° to prevent impeller eccentric wear.

- The outlet and pipe connection is sealed with a ** explosion-proof flange + rubber gasket**, bolts are symmetrically and evenly tightened to prevent leakage.

- Install a **anti-clogging filter** (pore size ≤ particle diameter that the pump can pass through) at the inlet, and regularly clean and maintain it.


询价单
 Click submit means you agree to《Service terms》《Privacy policy》

18369737998