Zhongke Zhengqi Water Quality Spectral Transparency Sensor, Water Quality Sensor, Transmission Customization_SupplyPro Co., Ltd._Zhongke Zhengqi (Beijing) Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Zhongke Zhengqi (Beijing) Technology Co., Ltd.

Water Quality Monitoring, Weather Station, Fume and Dust Concentration Meters

16755555612

Zhongke Zhengqi Water Quality Spectral Transparency Sensor, Water Quality Sensor, Transmission Customization

产品Price 0.01/Set

最小起订Quantity:1 Set 供货总Quantity: 10000 Set

用手机扫描二维码直达商品手机版
MobileView details
Location:
Beijing
有效期至:
长期有效
最后更新:
2023-07-07 23:35
Product Details

Technical Specifications

Principle of Measurement: Spectroscopic Absorption Method

Measurement Range: 0.100 cm

0...500cm

0...1000 cm (other scales available for customization)

Resolution: 0.01 cm

Temperature Measurement Range: 0.0...60.0℃

Medium Flow Rate     >0.02 m/s

Shell Material: Stainless Steel

Pipe Thread         NPT 3/4 or M39 x 1.5

Signal Wire Length: 5m (Customizable)

Accuracy

Calibration Method

Protection Grade

0...3bar

Pressure Range   Rs485 (MODBUS RTU)

2. Instructions for Use

2.1 Please carefully read the instructions before use.

2.2 This description applies to the Raymond Smart Series electrodes.

2.3 Sensor membrane heads are consumables; once damaged, they cannot be repaired.

2.4 Before opening the packaging, please inspect for any damage. If the outer packaging is damaged, do not proceed to open the package. Please contact the sales company, the authorized agent of the brand, or contact us directly immediately. After the carrier's representative arrives, open the packaging together to inspect for any damage to the electrodes and take photos as evidence.

2.5 If the outer packaging is intact but the electrodes are damaged, please contact the sales company, the authorized agent of the brand, or contact us directly, and return the electrodes in their original packaging.

2.6 Remove the protective sleeve gently before using the electrode.

2.7 During the measurement process, if there is dirt, adhesive material, or scale at the electrode membrane head, it can cause inaccurate or fluctuating measurement values. It should be cleaned and calibrated promptly.

2.8 The content described in this manual may change with the continuous improvement of the product. Our company will not provide separate notification in the manual and shall not be liable for any consequences arising therefrom.

2.9 This product requires regular replacement of the nozzle membrane.


3. Electrode wiring

3.1 Please connect the product according to the instructions carefully; incorrect wiring will result in complete product damage.

3.2 Absolutely no power supply before all cable connections are completed. For safety reasons, please thoroughly inspect all system wiring before supplying power and confirm that everything is completely correct.

Supply electricity.

—5. Green SHIELD lines over 30m in length require screen crossing

 

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
16755555612

Back to Top