Guangzhou Hongxin Waterproof Decoration Engineering Co., Ltd., Waterproofing Project Warranty10-20 years of experience, handling waterproofing projects of all sizes in urban areas. No hidden fees like service charges. Competitive pricing and guarantees! The company solemnly advises: Free on-site surveys and quotations throughout the city. No service charges collected! The decision to repair or not is entirely up to the customer.
Service Content:
Residential buildings, factories, warehouses, office buildingsBasement waterproofing grouting, roof repair, steel structure construction team available, long-term construction services; new and old roof waterproofing, tile roof restoration, property maintenance services for residential buildings and other structures.
Section II: Waterproofing materials for wall corners, roof surfaces, and exterior walls of underground buildings
Section 3: Waterproofing for bathrooms, swimming pools, reservoirs, floors, exterior walls, basements, and a series of other structures
Four: Waterproofing agents for untreated and treated interior and exterior wall seepage
V. Epoxy High-Pressure Grouting and Sealing Structures
Section 6: Offering a Variety of Waterproof Materials
Roof insulation, exterior and interior wall insulationInsulation for both interior and exterior walls, corrosion and rust prevention for steel structures, and various waterproofing projects.
Epoxy flooring materials,Epoxy Floor Paint, Floor Materials, Floor Materials, Color Epoxy Floor Paint Production, Floor Projects, Epoxy Floors, Epoxy Flat Floor Paint, Epoxy Floor Paint, Epoxy Resin Floor Paint, Abrasive Floor Materials, Industrial Floors, Sports Court Floors, Basement Floors, Industrial Floor Paint, Sports Field Floors, for the construction and undertaking of Epoxy Floor Projects
We've compiled the following waterproof tile application principles for you:
1. The materials used ensure the bonding strength between the waterproof coating and the base layer. Do not force the application if the base layer surface is not able to be sandblasted to meet construction requirements.
2. The wall waterproofing layer is chosen to use more rigid waterproof coatings, such as Langkaiqi L-185, EZ610, etc.
3. After applying the waterproofing layer, apply a layer of cement mortar. Once the cement mortar is set without any hollows, adhere the tiles to the cement mortar surface.
4. When laying tiles, do not cover from bottom to top in one go; instead, divide it into two to three stages. Wait until the adhesive hardens and the tiles are firmly attached before proceeding to the next stage.
5. On polymer-cement waterproof coatings, if the traditional thick-laminating method is used, such as using cement mortar to adhere tiles, the water-cement ratio should be strictly controlled, and gaps should be left without early filling to prevent the waterproof coating from being continuously soaked in water, leading to poor bonding strength. The cement mortar itself (thickness of 2~5cm) plus the weight of the tiles, which can exceed 20~40kg per square meter, far exceeds the load that the waterproof coating can bear, inevitably causing the tiles to peel off from the waterproof layer on vertical surfaces.










