Huazhan Electrical and Mechanical Installation, Cable Laying, Cable Installation Work, Mineral Cable Installation_供应产品_Tai Kang County Hua Zhan Electrical and Mechanical Installation Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
15515916259

Huazhan Electrical and Mechanical Installation, Cable Laying, Cable Installation Work, Mineral Cable Installation

产品Price 10.00/Rice

最小起订Quantity:1 Rice 供货总Quantity: 10000 Rice

用手机扫描二维码直达商品手机版
MobileView details
Location:
Henan/Zhoukou
有效期至:
长期有效
最后更新:
2023-02-02 15:38

Recommended Products

猜你喜欢

Product Details

Expertly handles cable laying projects across China, including high and low voltage cable installations. Services for residential, commercial, office buildings, subways, factories, chemical plants, etc. Professional construction team, ample personnel, and complete tools. Experienced in various pipeline, bridge, and cable trench installations. Contact: Mr. Zhou, 15515916259.Tai Kang County Hua Zhan Electrical and Mechanical Installation Co., Ltd.


Cable laying construction methods


(1) Construction Process

Construction Preparation → Cable Tray Installation → Cable Laying → Insulation Testing → Identification Plates

(2) Technical Measures

1) Prior to installation, the cable must be thoroughly inspected to ensure specifications, models, cross-sections, and voltage ratings meet requirements. The cable should have no distortion or damage.

2) Insulation measurements should be conducted prior to cable laying. For projects using cables rated below 1kV, the insulation resistance between conductors and to ground should be measured using a 1kV megger and should not be less than 10MΩ. After testing, the core wire should be discharged to ground.

3) After the cable test is completed, the cable ends should be sealed with rubber sheathing and then wrapped with tape.

4) Cable Laying Equipment: When using mechanical cable laying, the machinery should be installed in an appropriate location, and the wire rope and pulley should be properly set up. For manual cable laying, pre-install the roller wheels.

5) Temporary Liaison Command System Setup

a. For shorter routes or outdoor cable laying, radio walkie-talkies can be used for communication, and handheld megaphones for directing.

b. Cable laying in high-rise buildings, radio walkie-talkies for directional communication, simple telephones for line-wide communication, handheld megaphones for directing (or use a multi-functional amplifier, which is the equipment for directing cable laying).

6) When laying multiple cables on a bridge架, draw the cable arrangement in a table or diagram beforehand based on the actual on-site conditions to prevent cable crossings and confusion.

7) Cable handling and bracket installation

a. For short-distance cable handling, the rolling cable drum method is generally used. When rolling, follow the direction indicated by the arrow on the cable drum. If there is no arrow, roll in the direction of the cable winding, but never in the opposite direction to prevent the cable from becoming loose.

b. The selection of the installation location for cable brackets should prioritize ease of laying, ideally near the start and end points of the cable. During installation, attention should be given to the rotation direction of the cable shaft, with the cable exit end positioned above the cable shaft.




询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
15515916259

Back to Top