Pressure Sealing, Gas Pressure Opening_SupplyPro Co., Ltd._Yancheng Warwolf Pipeline Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Yancheng Warwolf Pipeline Technology Co., Ltd.

Pressure-Pipe Boring, Pressure Sealing, Pressure Plugging

Consultation Hotline
15365656588

News Center Co., Ltd.
  • No News

Product Categories
Home > SupplyPro Co., Ltd. > Pressure Sealing, Gas Pressure Opening
Pressure Sealing, Gas Pressure Opening
品牌: War Wolf
Brand: War Wolf
Construction Type: Pressure Seal Fitting
Work pressure: 10 MPa
单价: 1580.00/Next
最小起订Quantity: 1 Next
供货总Quantity: 500 Next
有效期至: 长期有效
最后更新: 2023-03-04 16:12
 
详细Info

What is the process for pressure sealing?

First, open the gate valve to its maximum diameter to facilitate the insertion of the cutting blade. Next, rotate the handwheel clockwise while maintaining stable pressure. When the center aligns with the pipeline, turn the handwheel counterclockwise by half a turn. Once everything is set, start the motor after drilling through the pipeline wall, and then rotate the handwheel to the right.

Cut the power, indicating the wiring has been properly twisted. Then, continue turning the handwheel in the clockwise direction, pushing the cutting blade inward against the pipe wall. Reverse the direction, until the pressure管道is sealed. Finally, cut the power by severing the pipe wall. Turn the handle counterclockwise to retract the cutting blade to zero position, close the gate valve, and remove the drilling machine to complete the pipe sealing under pressure.

What is pressure seal plugging

1. When repairing pipelines, pressure maintenance methods are often required in many situations. Repairing under no pressure requires a different procedure. Initially, you need to prepare the required materials, such as plug-in bladders, conduit pipes, along with pressure gauges and inflation pumps, etc. Additionally, you'll need to set up supports, including pulleys and water pumps – these tools are crucial.

2. When starting up, assembly of the various components is required, inflation via an air pump is necessary, but the air pressure must not exceed 0.015MPA. Additionally, check for any air leaks, and then proceed to install the guiding device.

3. After everything is set, close the drainage outlet, place the drainage pump into the well, then gradually open the ball valve to release pressure in the pipeline. Drainage is then conducted based on the water level. Finally, use a water-blocking airbag to reach the position, and stop inflating once the specified pressure is achieved.


询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15365656588