详情描述

Clean various heat exchangers, condensers, industrial pipelines, boilers, and steam power plant equipment condensers. Glan Chemical Co., Ltd. offers reliable cooperation.

Jining Greentech Chemical Technology Co., Ltd. (Abbreviated to Jining Greentech)Green Clean Solutions Co., Ltd.Established2010YearIs industrialVariousHeat Exchanger EquipmentWashingTheProfessionalCompany. The company hasSetPhilosophy of operation, industrial equipment cleaningTechnologyResearch and development capabilities, undertakingIndustry, Private Enterprises,Business in industrial chemical equipment, power plant equipment, condenser for power plants, boilers, and boiler air preheater cleaningAir conditioning cleaning, heat exchange equipment cleaning, handling cleaning services for machinery and chemical equipment; also undertake cleaning and descaling of refrigeration and heating equipment.燃气锅炉清洗山东潍坊诸城

JiningGreen Clean Company stocks250mpaDozens of cleaning machine models, over a dozen chemical cleaning pump stations. Mainly serving enterprises: power plants, chemical factories, oil refineries, food factories, institutions and enterprises, heating equipment, etc. The company also provides long-term services forIndustryCustomers perform cleaning and design of industrial heat exchangers.

Our company has recently purchased domestic cleaning machines and imported cleaning equipment. We have also hired experienced professionals in the cleaning industry.Technical SpecialistStandardization and regularization have been achieved in the cleaning of heat exchange equipment.

undefined


Chemical Cleaning Scale Removal Process

Recirculating cleaning utilizes two existing parallel ash removal pipelines to form a loop, creating a circulation system with the cleaning pump station. A certain concentration of acidic solution is added, and it circulates through the ash water pipes for cleaning. Additionally, as the acid washing reaches a certain level, the solution is continuously replenished with more acid. For short-distance single ash water pipelines, if conditions permit, a temporary pipeline can be laid to create a recirculation loop for cleaning. This process must be carried out while the system is shut down, and it is complex and costly.

No two grey pipes can form a loop during cleaning; only a single grey pipe can be used for open circuit cleaning. The method involves connecting one end of the grey pipe to the cleaning unit and continuously preparing a certain concentration of cleaning solution in the blending tank, then injecting it into the grey pipe continuously or intermittently. This process requires the addition of cleaning equipment during shutdown, which increases the cost.

The process involves continuously injecting a specific amount of acidic fluid while also introducing a certain quantity of cleaning inhibitor for the ash conveying pipes and a pipeline descaler. This is an open-loop cleaning method. The primary role of the cleaning aids is to enhance the reaction between the acidic fluid and the ash deposits at a certain concentration and flow rate, while also increasing solubility in water and reducing airlock occurrences, ensuring the quality of ash pipe cleaning.燃气锅炉清洗山东潍坊诸城

High-pressure water jet cleaning offers high efficiency, low costs, non-damaging to workpieces, environmental friendliness, ease of operation, and safety benefits.

Advantages of high-pressure water technology include:

Due to the pressure of high-pressure water being less than the compressive strength grade of metal, high-pressure cleaning will not damage the substrate being cleaned.

Components cleaned with high-pressure water jetting do not require secondary cleaning.

(1) Classified by chemical composition, they can be categorized into carbonate scale, sulfate scale, silicate scale, and mixed scale, etc. The main components of carbonate scale are calcium carbonate and magnesium carbonate; the main components of sulfate scale and silicate scale are calcium sulfate and silicate compounds, respectively; mixed scale is usually a mixture of the above three types.

Lime scale primarily forms due to the salts of calcium and magnesium present in the boiler feed water, which precipitate and adhere to the metal surface upon heating. The thermal conductivity of lime scale

Corrosion intensifies, leading to scale corrosion in pipelines and accelerates the damage to the heated surfaces. Once scale forms, it should be promptly removed using mechanical or chemical methods. Effective ways to prevent or slow down scale formation include strictly controlling the quality of the feedwater and using appropriate water treatment agents and waste removal.
Heat Exchanger and Refrigeration Equipment Cleaning - Choose GreenChem for Reliability