Home > News Center Co., Ltd. > Operation Requirements and Procedures for Asphalt Mixers
News Center Co., Ltd.
Operation Requirements and Procedures for Asphalt Mixers
Publish Time:2023-09-04        View Count:66         Return to List

Operation Requirements and Procedures for Asphalt Mixers. As an equipment in the chemical industry, asphalt mixers still pose certain dangers, so it's essential to follow the regulations during operation. Therefore, today, I'm here to discuss the operation requirements and procedures for asphalt mixers.


I. Requirements for asphalt mixing equipment during the operation of the mixing tower.

Before starting the machine, the control room operator must sound the horn as a warning. Upon hearing the horn, personnel around the machine should move to a safe area. The operator can only start the machine after confirming the safety of people outside.

2. Operators are not permitted to perform equipment maintenance while the machine is in operation. Maintenance should only be carried out under safety assurance, and the control room operator must be informed. The control room operator can only start the machine upon approval from personnel outside.

II. Requirements for asphalt mixing equipment during the repair of the mixing tower.

Always wear a securely fastened safety belt when working at heights.

2. When someone is working inside the machine, there must be an attendant outside. Additionally, the mixer's power should be disconnected, and the operator in the control room cannot start the machine without approval from the outside personnel.

Bitumen mixing equipment has specific requirements for loaders. During the process of loading materials onto the site, loaders must be cautious of personnel in front and behind the vehicle. When loading into the cold material bin, utmost attention must be paid to speed and positioning; collisions with the equipment must be avoided at all costs.

Smoking is prohibited within 3 meters of diesel tanks and oil drums. No open flames are allowed. The person releasing the oil must ensure it does not spill. When releasing asphalt, the quantity inside the tank must be checked first. The entire valve must be opened before the pump can be turned on to release the asphalt. Smoking on the asphalt tank is strictly forbidden.

Section 3: Operation Process of Asphalt Mixing Equipment

Motor section: Operate in accordance with the relevant provisions of the General Operating Procedures.

2. Clear the site, inspect the safety and reliability of all protective devices, and ensure that fire-fighting equipment is complete and effective.

Ensure all components are intact, check for any looseness in the transmission parts, and verify that all connecting bolts are securely fastened.

4. Inspect the adequacy of all lubricants and greases, ensure the oil level in the gear box is appropriate, verify the oil usage in the pneumatic system, and check if the oil quantity is normal.

5. Inspect the quantity, quality, specifications, and other technical parameters of granular materials, mineral powders, asphalt, fuel, and water to ensure they meet production requirements.

Here is the operation requirements and process for asphalt mixers, brought to you by our editor. We hope that all construction personnel will strictly adhere to the construction requirements after reading this article, as this is a demonstration of responsibility for our safety and that of others.