What are the standards for scaffold dismantling?_News Center Co., Ltd._Dongguan Shunyi棚架Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Dongguan Shunyi棚架Engineering Co., Ltd.

Expert in scaffolding engineering, specializing in bamboo raft mountain const...

Consultation Hotline
13712309948

Product Categories

Contact Information
  • Contact person:刘经理
  • Telephone:13712309948
  • Mobile:13712309948
Home > News Center Co., Ltd. > What are the standards for scaffold dismantling?
News Center Co., Ltd.
What are the standards for scaffold dismantling?
Publish Time:2024-03-28        View Count:14        Return to List

What are the standards for dismantling scaffolding? What should be noted when dismantling scaffolding? After a construction site has finished using scaffolding, it needs to be dismantled. Just like the construction of scaffolding, its dismantling also has corresponding standards. Today, the editor brings you the precautions for dismantling scaffolding. Take a look!

When dismantling scaffolding, we need to pay attention to 8 points:

During dismantling, mark the work area and set up caution signs around, with a designated person supervising and directing, and strictly prohibit non-employees from entering.

2. Elevated work personnel must wear a hard hat, fasten a safety belt, tie up their leggings, and wear soft-soled shoes before being allowed to perform shelf work.

To disassemble the pole, hold the upright pole and undo the two clips at the top. When removing the crossbar and the diagonal brace, first undo the middle clip, then support the middle, and finally release the end clip.

4. Scaffold dismantling requires a designated person to coordinate统一指挥, with clear communication and coordinated actions. When releasing a knot related to another, it is essential to notify the other party first to prevent falls.

5. Materials removed should be secured with ropes and gradually lowered using pulleys; throwing is strictly prohibited. Materials transported to the ground should be placed at designated spots, transported as they are removed, and sorted for storage. Materials should be cleared on the same day they are removed. Removed fasteners should be collected and lubricated at the bolt turning points.

6. During dismantling operations, any sections requiring reinforcement should be strengthened before removal to prevent collapse of the structure.

7. Absolutely no collision with power lines near the scaffolding during dismantling to prevent accidents.

8. No personnel changes are allowed during the dismantling process. If a change is necessary, the situation must be clearly explained before departure, and solitary dismantling operations are prohibited.

 Click submit means you agree to《Service terms》《Privacy policy》

13712309948