Today, we're introducing how to maintain the daily upkeep of a large twin-screw granulator? Let's take a look!
1. Inspect and adjust the motor, control instruments, various pipelines, and working components. In the event of a sudden power outage during production, the main drive and heating will cease. Upon power restoration, each section of the extruder barrel must be heated to the specified temperature and maintained for a period of time before starting the extruder.
If the instrument and pointer indicate full rotation, check for good contact on the side lines of the thermocouple.
3. The inner walls of the cooling water pipes for large twin-screw granulators are prone to scaling, and the exterior is susceptible to corrosion and rust. During routine maintenance, a thorough inspection should be conducted. Excessive scale can block the pipes, rendering the cooling ineffective, and severe corrosion may lead to leaks. In daily maintenance, measures for descaling, anti-corrosion, and cooling must be implemented.
Introducing the daily maintenance procedures for the large twin-screw granulator. After reading this, you should have a better understanding of the large twin-screw granulator. If you're unclear, remember to reach out to us.





