Waterproof powder blends with eco-friendly adhesive to mix with the corresponding (required) construction materials, serving as an adhesive and coating layer. It is easy to use, dissolving in cold or warm water without the need for heating.

What should be noted when using waterproofing powder during construction?
1. During construction, avoid intense sunlight and rain. If the temperature exceeds 35℃ or it's raining, pause the work and take proper covering measures. Areas exposed to rain should be cleared of standing water and repainted after the rain stops.
2. Each batch of thinned paint should be used within two hours; dried paint should not be used. After completion of the work, the construction tools should be cleaned immediately to avoid difficulties in cleaning once they have cured.
After the waterproof adhesive layer solidifies, when it no longer sticks or leaves marks upon touch, intensified maintenance should be carried out. This can include applying a crack-resistant maintenance spray or watering for maintenance. In winter, it should be kept warm for maintenance, with a duration of no less than three days.
4. It is strictly prohibited to walk on the waterproofing powder coating during the curing period of the waterproof layer without protective coating. The cured waterproof layer should not be drilled, punctured, damaged by gravity, or have debris stacked on it.
5. Waterproofing powder is a slightly alkaline powder that may cause slight irritation to the skin and eyes. When in use, gloves should be worn to prevent it from entering the eyes or coming into contact with the skin.
6. Prior to use, conduct a trial with a sample to determine the technical properties and color, then select the appropriate application method.