Teach You How to Properly Install Dongguan Bus Shelter_News Center Co., Ltd._Dongguan Bao Hua Metal Products Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Dongguan Bao Hua Metal Products Co., Ltd.

Specialized metal product manufacturing factory for urban intelligent public ...

Consultation Hotline
18988703838

News Category
  • No Category

Contact Information
  • Contact person:张经理
  • Telephone:18988703838
Home > News Center Co., Ltd. > Teach You How to Properly Install Dongguan Bus Shelter
News Center Co., Ltd.
Teach You How to Properly Install Dongguan Bus Shelter
Publish Time:2024-05-09        View Count:85        Return to List

Dongguan's bus shelter is a common sight in everyday life. While its design appears simple, the construction process is actually quite complex, and there are bound to be some oversights during installation. So, what is the correct way to install a Dongguan bus shelter? Don't worry, Dongguan Pinzhu Metal Products Co., Ltd. is here to teach you how to install a Dongguan bus shelter properly.

1. Rust-proof Spray Painting Treatment: Clean off slag and splashes thoroughly, and apply multiple layers of rust-proof spray paint to the surface. The thickness of the paint film and coating must meet the design requirements and construction specifications. The inner surface paint must not be missed either.

2. Inspection Adjustment: Glass must undergo comprehensive adjustment and inspection, ensuring standards of levelness, perpendicularity, and flatness. Deviations must not exceed the permitted range.

3. Connect tension cables: Locate the rod基准line and elevation line, install embedded parts according to drawings or construction requirements, and weld the railing.

4. Stainless Steel Glass Claw Installation Welding: Pop out the elevation and longitudinal lines according to the design dimensions, clamp with fixtures, perform spot welding for positioning, complete assembly, and weld the glass claw base.

5. Sealing on Both Sides: Clean the gaps between glass panels thoroughly, ensuring there are no water, oil stains, paint, rust, mortar, dust, or other debris. Properly clean and dry the bonding surfaces. To adjust the gap depth, avoid adhesive on all three sides. Apply protective tape on both sides of the gap to prevent contamination of the glass. Seal both sides simultaneously with sealant, then smooth the sealant joint surface and remove excess adhesive. After applying the sealant, peel off the protective tape, and if necessary, clean the glass with a solvent. Avoid dust and scratches on the sealant before it fully hardens.

6. Laminated Glass Processing, Manufacturing, and Installation: Determine the actual glass dimensions based on design drawings and measured sizes, including its horizontal and vertical positions. Manufacturers will process and manufacture the glass. Install stainless steel glass clips, and after temporarily securing the glass, adjustments must be made to ensure it is level, plumb, and flush. Deviations must not exceed the specified range.