What to pay attention to during the construction of epoxy flooring?_News Center Co., Ltd._Nanjing Green Ocean Environmental Protection Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Nanjing Green Ocean Environmental Protection Eng

Primarily engaged in the manufacturing and construction o...

13813904883
 

News Category
  • No Category
Home > News Center Co., Ltd. > What to pay attention to during the construction of epoxy flooring?
News Center Co., Ltd.
What to pay attention to during the construction of epoxy flooring?
Publish Time:2023-06-19        View Count:24         Return to List

Static Dissipative Epoxy Floor Coating Bubbles; Cause: High humidity in the exposed layer of the structural element, near the water tank, basement floor, or other elevated areas; lack of water cutoff treatment or poor sealant application. Prevention: Use a moisture meter to assist in identification before construction; perform water cutoff treatment in areas with excessive moisture and water pressure; choose hydrophilic epoxy primer. Color Difference; Cause: Sedimentation of the epoxy paint base, insufficient mixing; prolonged contact time with the surface during material pouring; uneven coating thickness; material interruption during application; use face paint from different batches.

Preventive Measures: Thoroughly mix the main agent before construction; avoid prolonged contact with the previous joints; ideally, carry out the entire operation line simultaneously; utilize fixed tools and enhance the proficiency of construction personnel; ensure an adequate supply of paint to prevent interruptions; and preferably use paint from the same batch.

Volcano reasons; Substrate of self-leveling floor paint has depressions; Presence of oil stains; Paint material issues; Preventive measures: Repair and fill depressions with epoxy putty before proceeding with construction; Clean the oil stains thoroughly; Select appropriate paint. Whitening; In winter, paint reaction is too slow, and hardener reacts with air to produce a white fog; Construction in low-temperature and humid environments; Water intrusion after construction.

Preventive Measures: Choose the appropriate hardener; avoid construction under low temperature and high humidity conditions, and take measures such as heating and dehumidification if necessary, like using air conditioning to heat and dehumidify, or a heater to warm up; prevent water intrusion after construction.


 Click submit means you agree to《Service terms》《Privacy policy》

13813904883