Yantai Kexin Clock Co., Ltd. produces tower clocks with precise timekeeping and zero error, mainly guaranteed by the following technologies:

1. GPS real-time time synchronization, achieving synchronization with satellite standard time, the master control system's master clock has no cumulative error, every second and minute is accurate.

2. Reliable IoT technology and feedback supervision system for the subordinate clocks (large face clocks), ensuring synchronization between the large face clocks and the master clock. The subordinate and master clocks automatically synchronize every 15 seconds. In case of a subordinate clock malfunction, an automatic alert is issued along with a suggested solution.

3. Our self-manufactured movement is the core component of the tower clock, crafted from babbitt bronze for the shaft bearings and 45# steel that has undergone rigorous mechanical heat treatment, significantly enhancing the movement's wear resistance. The fully enclosed design ensures no maintenance or upkeep is required, guaranteeing a lifespan of 50 years.

4. Professional installation staff ensures the normal operation of the equipment. Our company boasts skilled installers and several well-trained高空作业 personnel. Our experience is that three parts rely on the equipment, and seven parts on the installation. Our offices and service centers spread throughout the country truly ensure customers' peace of mind in purchasing and worry-free usage.

5. With years of technical accumulation, our company is capable of repairing tower clocks from all brands across the nation. To assure our customers of their choice, we promise a 5-year free warranty on all repairs.

Tower Clock Grand Clock Production and Installation Process

Estimated Project Duration: [Number] calendar days

Including: Manufacturing Lead Time: 20 days

Transportation & Installation Lead Time: 10 days

One, production, ensure manufacturing schedule plan

1. Based on the signed contract. The day after the contract is signed, the company issues production schedules to all production departments (including each production workshop, technical department, and logistics center). The schedules should clearly specify the dimensions, colors, functions, and shipment dates of each clock. Additionally, a detailed "Material Requirement Sheet" should be attached.

2. The technical department is responsible for determining the technical solution based on the specific requirements of the bidder's tender documents, and providing it to the production workshop for production. The logistics center, based on the "Material Requirement Sheet" and the current inventory status, drafts a detailed "Procurement Plan." The procurement plan is issued to: electronic component procurement specialist, outsourced procurement specialist, and bulk material procurement specialist. The required approximate funds are also notified to the finance department.

3. Begin procuring various materials starting from the second day, with priority given to the urgent materials needed for production.

4. The company's existing stock materials and equipment spare parts, such as control systems and cores, will be immediately put into production according to the contract requirements. The basic manufacturing of control systems and cores will be completed within the 3rd to 13th day. They will then progressively move into the debugging and trial operation processes.

5. Basic completion of the clock face manufacturing (外观件不需调试) within the 3rd to 13th day.

6. By the 8th to 11th day, all packaging materials will be in stock, and the wooden boxes for packaging will be completed.

7. All debugging must be completed by the 18th day, followed by inspection prior to packaging, and completion of various documents and forms required for packaging.

8. All packaging is completed by the 19th day.

9. Notify Party A that the shipment is ready for dispatch, and confirm with Party A the specific unloading location and installation time.

10. Installation personnel will arrive at the installation site ahead of schedule, as agreed upon by both parties, to prepare for the installation. The following day, they will inspect the goods with Party A and begin the installation.

II. Clock Equipment Transportation and Installation Plan:

(Part 1) Packaging, Shipment, and Transportation Solutions

1. In terms of packaging, for general control instruments and computer accessories, we use cardboard boxes, filled with shock-absorbing foam and moisture-proof plastic bags. For items like dials and valuable materials (such as control boxes, clock hands, scales, etc.) as well as items weighing over 20 kilograms, we add an additional wooden crate (constructed with high-quality plywood) outside the cardboard box. Similarly, shock-absorbing foam is added between the wooden and cardboard boxes. All packaging is neat, aesthetically pleasing, and reliable, loaded into trucks according to road transport requirements to ensure goods arrive intact and undamaged.

2. Each package box includes a detailed product packing list, factory inspection certificate, quality inspection certificate, manual, etc. The box is sealed after being inspected and approved by the inspector.

Each packaging box is imprinted with the shipper, departure station, consignee, destination station, product name, gross/net weight, total number of pieces in this shipment, contract number, etc. Additionally, it features the "Three Protection" marking.

4. Transportation. For this shipment of *** equipment, we will select the most suitable transportation method, such as road or rail, based on the installation location of the tower clock project and the requirements for equipment transportation. We guarantee the safe, accurate, and timely delivery of the goods to the destination. Any losses due to loss or damage will be borne by us. Within 48 hours prior to the dispatch of the equipment, we will send the recipient a fax with details including the station name for installation, quantity, estimated installation date, contract number, material name, quantity, gross weight, volume, amount, name of the transportation vehicle, and the equipment dispatch schedule.

5. Arrival Inspection and Handover

Upon arrival at the buyer's destination, our project manager and the buyer's representative will jointly inspect the goods in accordance with the contract. The inspection scope includes the quantity, specifications, model, quality, and performance parameters of the equipment. Both parties will sign and stamp the delivery (receipt) document, which serves as a crucial basis for operational handover. If any goods do not meet the buyer's requirements, the buyer has the right to refuse acceptance or request a replacement, and any resulting costs will be borne by our company.

(II) On-site Inspection and Installation Entry

1. On-site Installation Inspection

1) Upon arrival of the goods on-site, the installation personnel will inspect the number of packaging boxes and their condition for any damage or missing items, in accordance with the "Shipment Registration Form," together with the recipient.

2) Inspect the goods inside the packaging boxes with the buyer, itemizing and counting according to the packing list.

3) Briefly describe the name, quantity, use, and storage requirements of various goods for the buyer, so that a safe storage location can be provided.

2. Installation On-Site

1) All goods shall be delivered to the designated location according to the installation schedule as per the contract or mutually agreed upon by both parties. Prior to installation, a storage location for the goods shall be agreed upon with Party A to ensure a safe storage area for the uninstalled goods.

2) Collaborate with the buyer to determine installation conditions and make necessary modifications to those that do not meet requirements, ensuring a safe and smooth installation.

3) Inform the buyer of the approximate time for acceptance, so they can prepare accordingly.

(3) Clock Equipment Installation

Equipment Installation Steps:

1. Assemble the clock face on the respective work surface.

2. Rent suitable lifting equipment and use the whole-set lifting method to weld or bolt the large bell steel frame to the reserved ironwork in the bell tower.

3. Reserve piping between the sub-clock and the master clock, lighting lines, and piping between the speakers and the amplifier.

4. Accept scale illumination wire, movement illumination wire.

5. Install the speaker and connect the speaker power cable.

6. Connect the motor wire and feedback wire to the motor and feedback switch on the core.

7. Connect all motor lines, feedback lines, lighting lines, and speaker lines to the master clock system and the control room where the public address system is located.

8. Connect to the GPS timing system.

9. Connect and debug the monitoring microcomputer.

III. Clock Equipment Operation and Debugging

Commissioning period: 3 calendar days, with simultaneous training for the client's designated operators during the debugging phase.