Tower Clock Grand Clock Production and Installation Process
Estimated Project Duration: [Number] Calendar Days
Including: Manufacturing Lead Time: 20 days
Transportation and installation lead time: 10 days
I. Production, guaranteed manufacturing schedule
1. Based on the signed contract. The day after the contract is signed, the company issues production schedules to all production departments (each production workshop, technical department, logistics center). The schedules clearly specify: the dimensions, colors, functions, and shipment dates of each clock. A detailed "Material Requirement Sheet" is also attached.
2. The technical department is responsible for determining the technical solution based on the specific requirements of the client's tender documents, and providing it to the production workshop for production. The logistics center, based on the "Material Requirement Sheet" and the current inventory status, drafts a detailed "Procurement Plan Sheet." The procurement plan is then issued to: electronic component procurement officer, outsourced procurement officer, and bulk material procurement officer. The required approximate funds are also notified to the finance department.
3. Begin procuring various materials starting from the second day, with priority given to the urgent supplies needed for production.
4. The company's existing stock of materials and spare parts, such as control systems and cores, will be immediately put into production according to the contract requirements. By the 3rd to 13th day, the basic manufacturing of control systems and cores will be completed. They will then gradually proceed to the debugging and trial operation processes.
5. The clock face production is essentially completed within the 3rd to 13th day (the outer components do not require adjustment).
6. By the 8th to 11th day, all packaging materials will be in place, and the wooden boxes for packaging will be completed.
7. All debugging must be completed within the 18th day, followed by inspections prior to packaging and the completion of various packaging-related documents and forms.
8. All packaging is completed by the 19th day.
9. Notify Party A that the shipment is ready for dispatch, and confirm with Party A the specific unloading location and installation time.
10. Installation personnel will arrive at the installation site in advance, according to the agreed schedule between both parties, to prepare for the installation. The following day, they will inspect the goods together with Party A and begin the installation process.
II. Clock Equipment Transportation and Installation Plan:
(Part 1) Packaging, Shipment, and Transportation Solutions
1. In terms of packaging, for general control instruments and computer accessories, we use cardboard boxes, which are lined with shock-absorbing foam and moisture-proof plastic bags. For clock faces, valuable items (such as control boxes, clock hands, dials, etc.), and goods weighing over 20 kg, we add an outer wooden crate (made from high-quality plywood) to the cardboard box. Similarly, shock-absorbing foam is also placed between the wooden and cardboard boxes. All packaging is neat, attractive, and reliable, loaded onto trucks according to road transport requirements to ensure goods arrive at the destination intact.
Each carton is accompanied by a detailed product packing list, factory certificate of conformity, quality inspection certificate, and manual, etc. The carton is sealed after being inspected and approved by the inspector.
Each packaging box is imprinted with the shipper, departure station, consignee, destination, product name, gross/net weight, total number of pieces in this shipment, contract number, and the "Three Protection" symbol.
4. Transportation: For this shipment of *** equipment, we will select the most suitable transportation method, such as road or rail, based on the installation location of the tower clock project and the requirements for equipment transportation. We guarantee the safe, accurate, and timely delivery of the goods to the destination. Any losses due to loss or damage will be borne by us. Within 48 hours prior to dispatching the equipment, we will send the recipient a传真 containing details such as the station name, quantity, estimated installation date, contract number, material name, quantity, gross weight, volume, amount, name of transportation vehicle, and a dispatch schedule for the equipment.
5. Arrival Inspection and Handover
Upon arrival at the buyer's destination, our project manager will jointly inspect the goods with the buyer's representative in accordance with the contract. The inspection scope includes the quantity, specifications, quality, and performance parameters of the equipment. Both parties will sign and stamp the delivery (receiving) document, which serves as a crucial basis for operational handover. In case of goods that do not meet the buyer's requirements, the buyer has the right to refuse acceptance or request a replacement, and the resulting expenses will be borne by our company.
(II) On-site Inspection and Installation Entry
1. On-site Installation Inspection
1) Upon arrival of the goods at the site, the installation personnel will, together with the recipient, check the quantity of packaging boxes and whether they are damaged or missing any items, based on the "Shipment Registration Form."
2) Inspect the goods inside the packaging boxes with the buyer, checking off each item as listed on the packing list.
3) Briefly describe the names, quantities, uses, and storage requirements of various goods to facilitate the supplier in providing a safe storage location.
2. Installation on-site
1) All goods shall enter and arrive at the designated location according to the installation schedule as agreed upon by the parties or at a time mutually determined. Prior to installation, the storage location of the goods shall be agreed upon with Party A to ensure a safe storage area for the uninstalled items.
2) Collaborate with the buyer to determine installation conditions and modify any that do not meet requirements for a safe and smooth installation.
3) Inform the buyer of the approximate time for acceptance, so they can prepare accordingly.
(3) Clock Equipment Installation
Equipment Installation Steps:
1. Assemble the clock face on the designated work surface.
2. Rent suitable lifting equipment and employ the whole-lifting method to weld or bolt the large bell steel frame with the reserved ironwork in the bell tower.
3. Reserve piping between the subclock and the master clock, lighting lines, and piping between the horn and the amplifier.
4. Connect scale illumination wire, movement illumination wire.
5. Install the speaker and connect the speaker power cable.
6. Connect the motor wire and feedback wire to the motor and feedback switch on the core.
7. Connect all motor wires, feedback wires, lighting wires, and speaker wires to the master clock system and the amplifier in the control room where the speakers are located.
8. Connect to the GPS time synchronization system.
9. Connect the monitoring microcomputer and tune the monitoring system.
Section 3: Clock Equipment Operation and Tuning
Debugging period: 3 calendar days, with the customer's designated operators' training conducted simultaneously.