Prepare the accessories; fit the drying tube (apply a layer of sealing grease at the opening of the tube); install the silicone plug; fit the components of each electrolytic cell and pour in the electrolyte.
Electrolysis cells are installed on the moisture content analyzer, and the sample needle is drawn to draw distilled water and wiped clean. After pressing the measurement button, the distilled water is pushed into the electrolysis cell, and the measurement begins once the balance is complete.
After sampling and conducting sample testing, insert the sample into the syringe. The testing procedure is identical to that of pure water calibration. Once the results are determined, you can print the test results.





