Bull New Energy Fast Charging Station 120KW, 4-Port DC Charging Station_SupplyPro Co., Ltd._Guangzhou Nengda Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Guangzhou Nengda Technology Co., Ltd.

Sales and maintenance of charging stations, construction of charging stations...

13922770061

Bull New Energy Fast Charging Station 120KW, 4-Port DC Charging Station

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Guangdong/Guangzhou
有效期至:
长期有效
最后更新:
2022-12-16 15:13
Product Details

Electric Vehicle Charger Brand

Number of charging interfaces

2

Power

380V

Bull New Energy Fast Charging Station 120KW, 4枪 DC ChargerElectric vehicle community charging stations are very popular around us, they are extremely convenient, and have brought a great deal of ease to our daily lives. Today, let's understand the characteristics of the power grid system of charging stations? Electric Vehicle Charging Station, a smart grid system designed to conserve energy, featuring a fast and intelligent charging network. Its aim is to meet the charging needs of electric vehicles around us, while providing certain safety maintenance during charging, ensuring a smooth charging process without concerns about battery damage. The EV charging station can release energy in a short period of time.iHigh-powered output to restore the battery capacity of electric vehicles to its original level, while also activating the power maintenance cutoff device during recharging, to minimize battery damage. This significantly maintains the battery health of electric vehicles and enhances charging power, saving our charging time.

快充13

Installation Method

This series of DC charging stations is designed for vertical installation.

Please follow the steps below for installation, based on our foundation plan:

1) Manufacture concrete bases with pre-installed 4 bolts and a charging桩 inlet at the center of the base; the inlet and bolts are positioned relative to the base.

Refer to the illustration below.

2) Once the cement base is ready, thread the pre-installed charging桩's power line through the bracket base, tighten the base screws, and secure the桩 to the cement base.

2. Pre-use Safety Inspection

1) Ensure the product is free from scratches, rust, and deformation.

2) Ensure the power outlets are safe and that there are no foreign objects left in the charging plug and vehicle-side charging outlets.

3) If there are any issues such as shell damage or exposed cable on the charging cable or charger head, please do not continue to use it.

4) Keep the charging gun plug dry; if there is water accumulation, please wipe the water from the charging plug with a dry and clean cloth while the entire桩体 is disconnected from power.

Dry.



询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13922770061

Back to Top