Bull New Energy 60KW Dual Gun DC Fast Charger_SupplyPro Co., Ltd._Guangzhou Nengda Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Guangzhou Nengda Technology Co., Ltd.

Sales and maintenance of charging stations, construction of charging stations...

13922770061

Bull New Energy 60KW Dual Gun DC Fast Charger

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Guangdong/Guangzhou
有效期至:
长期有效
最后更新:
2022-12-16 15:12
Product Details

EV Charger Brand

Number of charging interfaces

2

Power

380V

Bull New Energy Fast Charging Station 60KW Dual Gun DC Charging StationElectric vehicle community charging stations are very popular around us, highly functional, and greatly enhance our daily convenience. Today, let's explore the characteristics of the grid system for charging stations? Electric Vehicle Charging Station, a smart grid system designed to conserve energy, featuring a rapid and intelligent charging network. Its aim is to meet the charging needs of electric vehicles around us, while also providing certain safety maintenance during charging to ensure a smooth process without worrying about battery damage. The charging station can release energy in a short amount of time.iHigh power output ensures the battery capacity of electric vehicles is restored to its original amount, while simultaneously activating the power maintenance shutdown device to prevent excessive damage to the battery. This greatly maintains the battery health of electric vehicles, while also increasing charging power, saving our charging time.

快充8


Installation Method

This series of DC charging stations are designed for vertical installation.

Installation can be conducted according to our foundation map, following these steps:

1) Manufacture cement bases with pre-installed 4 bolts and a charging桩 inlet at the center of the base; the inlet and bolts are positioned relative to the base.

Refer to the image below.

2) Once the cement base is completed, thread the pre-installed charging桩 power line through the bracket base, tighten the base screws, and securely fasten the桩 to the cement base.

2. Pre-use Safety Inspection

1) Ensure the product is free from scratches, rust, and deformation.

2) Ensure the power outlets are safe and that there are no foreign objects left in the charging plug and vehicle-side charging outlets.

3) If there are issues such as shell damage or exposed cable on charging cables or charging枪heads, please do not continue to use them.

4) Keep the charging gun plug dry; if there is water accumulation, please wipe the plug with a dry and clean cloth while the entire pole is de-energized.

Dry.



询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13922770061

Back to Top