Guangdong Bull 120KW dual枪 DC charging桩 co-building station phone number_SupplyPro Co., Ltd._Guangzhou Nengda Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Guangzhou Nengda Technology Co., Ltd.

Sales and maintenance of charging stations, construction of charging stations...

13922770061

Guangdong Bull 120KW dual枪 DC charging桩 co-building station phone number

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Guangdong/Guangzhou
有效期至:
长期有效
最后更新:
2022-12-16 15:12
Product Details

Charging Station Brand

Number of charging ports

2

Power

380V

Guangdong Bull 120KW Dual Gun DC Charging Station Cooperation and Site Building Phone NumberElectric vehicle community charging stations are very popular around us, they are extremely convenient, and have greatly improved our daily lives. Today, let's explore the characteristics of the power grid system of charging stations? Electric Vehicle Charging Station, a dedicated smart grid system designed for energy conservation, featuring a fast and intelligent charging network. It aims to meet the charging needs of electric vehicles around us and provides certain safety maintenance during charging to ensure a smooth process without concerns about battery damage. The EV charging station can release power in a short time.iHigh-power output to restore the original battery capacity of electric vehicles, along with a power maintenance shutdown device during recharging, to minimize battery damage. This significantly maintains the battery health of electric vehicles while increasing charging power, saving our charging time.


快充15

Installation MethodThis series of DC charging stations is designed for vertical installation. Install according to the foundation map provided by our company, following these steps: 

1) Manufacture cement bases with pre-installed 4 bolts and a charging桩 input at the center of the base; the input wire and bolts are positioned relative to the base.Refer to the illustration below.

2) Once the cement base is ready, thread the pre-installed charging桩's incoming cable through the base of the bracket, tighten the base screws, and secure the桩 to the cement base.

2. Pre-use Safety Inspection

1) Ensure the product is free from scratches, rust, and deformation.

2) Ensure the power outlets are safe and that there are no foreign objects left in the charging plug and vehicle-side charging outlets.

3) If there are any issues with the charger cable or gun head, such as shell damage or exposed wire, please do not continue to use it.

4) Keep the charging gun plug dry; if there is water accumulation, please wipe the plug with a dry and clean cloth while the entire pole is de-energized.Dry.



询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13922770061

Back to Top