Community Property Management EV Bull Charger, 120KW_SupplyPro Co., Ltd._Guangzhou Nengda Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Guangzhou Nengda Technology Co., Ltd.

Sales and maintenance of charging stations, construction of charging stations...

13922770061

Community Property Management EV Bull Charger, 120KW

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Guangdong/Guangzhou
有效期至:
长期有效
最后更新:
2022-12-16 15:12
Product Details

Charging Station Brand

Number of charging interfaces

2

Power

380V

Community property management electric vehicle 120KW dual-port new energy rapid charging station, BullPlug chargerElectric vehicle community charging stations are very popular around us, they are extremely convenient, and have brought a great deal of ease to our daily lives. Today, let's explore the characteristics of the power grid system of charging stations? Electric Vehicle Charging Station, a smart grid system designed to conserve energy, featuring a fast and intelligent charging network. Its aim is to meet the charging needs of electric vehicles around us and provide certain safety maintenance during charging, allowing for a smooth charging process without worrying about battery damage. The EV charging station can release energy in a short period of time.iHigh-power output ensures the battery of electric vehicles is restored to its original capacity, and the power maintenance cut-off device is activated simultaneously for recharging, minimizing battery damage. This significantly maintains the battery health of electric vehicles while increasing charging power, saving our charging time.


快充12

Installation Method: This series of DC charging stations are for vertical installation. Installation can be carried out according to our foundation plan, following these steps:

1) Fabricate cement base with pre-installed 4 bolts in cement base and a charging桩 inlet at the center of the base; the inlet and bolts are positioned relative to the base.

2) Once the cement base is completed, thread the pre-buried charging桩 cable through the base of the bracket, tighten the base screws, and securely fasten the桩 to the cement base.

2. Safety Check Before Use

Ensure the product is free from scratches, rust, and deformation.

2) Ensure the power outlets are safe and that no foreign objects are left inside the charging plug and vehicle charging socket.

3) If there are any issues such as shell damage or exposed cable on the charging cable or charging gun head, please do not continue to use it.

4) Keep the charging gun plug dry; if there is water accumulation, please wipe the water off the charging plug with a dry and clean cloth while the entire pole is de-energized.



询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13922770061

Back to Top