Bull 120kW/240kW Commercial Site Operation Charging Pile Bus Sanitation Vehicle_SupplyPro Co., Ltd._Guangzhou Nengda Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Guangzhou Nengda Technology Co., Ltd.

Sales and maintenance of charging stations, construction of charging stations...

13922770061

Bull 120kW/240kW Commercial Site Operation Charging Pile Bus Sanitation Vehicle

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Guangdong/Guangzhou
有效期至:
长期有效
最后更新:
2022-12-17 14:35
Product Details

Charging Station Brand

Number of charging interfaces

2

Power

380V

Bull120kW/240KWHigh-power DC fast-charging桩 for commercial site operation, new energy bus and sanitation vehicleCommercial website operation model new energy public bus sanitation vehicleElectric Bus Charging Station - The direct current charging桩 for electric buses has a high power output, enabling100~200kWOn the left, a total input line loop configuration of an electric energy quality analyzer is used to monitor the power quality of the entire charging station supply loop. Simultaneously, an electrical fire monitoring device is set up. The charging loop uses three-phase power supply, with the incoming line equipped with an AC plastic case circuit breaker. The three-phase main loop is configured with a residual current relay to provide electric shock protection against indirect contact. Due to the high power consumption of such charging stations, it is recommended to install a track-type electric energy meter in the three-phase AC loop for total energy measurement, complemented by a DC electric energy meter to monitor the overall operational efficiency of the charging station. The charging management controller is responsible for the external human-machine interface, charging control, reading the DC electric energy meter's power data, and controlling the opening and closing of the DC charging output circuit breaker.

快充12


Bull120kW/240KWHigh-power DC fast-charging station for commercial site operation, new energy bus and sanitation vehicleRefillCaution for Electric Pole Charging: Safety matters: 1Do not place flammable, explosive, or combustible materials, chemicals, and flammable vapors near the charging station.2Keep the charging head clean and dry. If dirty, wipe with a clean, dry cloth. Do not touch the charging core with your hands when it is live.3Prohibited from using the charging station under any circumstances where the charger or charging cable has defects, cracks, wear, breakage, or any issues with the charging cable. If any are found, please contact staff immediately.4Do not attempt to disassemble, repair, or modify the charging station. If repair or modification is needed, please contact staff. Unauthorized operation may cause damage, leakage, or electrical hazards.5Prohibit the removal of the charger during charging to ensure personal and vehicle safety throughout the charging process.6In case of any abnormal conditions during use, immediately press the emergency stop button to cut off all input/output power supplies.7Please exercise caution when charging during rainy and thunderstorms.8Children should not approach or use the charging station while it is charging to avoid injury.9During charging, the vehicle is prohibited from driving; charging can only be performed when stationary. For hybrid electric vehicles, please turn off the engine before charging.



询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13922770061

Back to Top