Bull New Energy Electric Vehicle 120KW Cloud Platform Commercial DC Single & Double Gun Charging Station_SupplyPro Co., Ltd._Guangzhou Nengda Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Guangzhou Nengda Technology Co., Ltd.

Sales and maintenance of charging stations, construction of charging stations...

13922770061

Bull New Energy Electric Vehicle 120KW Cloud Platform Commercial DC Single & Double Gun Charging Station

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Guangdong/Guangzhou
有效期至:
长期有效
最后更新:
2022-12-17 16:00
Product Details

Electric Vehicle Charging Station Brand

Number of charging ports

2

Power

380V

Bull New Energy Electric Vehicle Charging Station Manufacturer120KWCommercial Cloud Platform DC Single and Double Gun New Energy Charging StationCommercial website operation model new energy bus for sanitation servicesElectric Bus Charging Poles - The direct current charging桩 for electric buses has a higher power rating, in100~200kWOn the left, a total input line loop is configured with an electric energy quality analyzer to monitor the power quality of the entire charging station supply loop. Simultaneously, an electrical fire monitoring device is set up, with the charging loop using three-phase power supply and the input line employing an AC plastic case circuit breaker. The three-phase main loop is equipped with a residual current relay to provide protection against indirect contact electric shocks. Due to the high power consumption of such charging stations, it is recommended to install a track-mounted electric energy meter in the three-phase AC loop for total energy measurement, complemented by a DC electric energy meter to monitor the overall operational efficiency of the charging station. The charging management controller is responsible for the external human-machine interface, charging control, reading the DC electric energy meter's energy data, and controlling the opening and closing of the DC charging output circuit breaker.

快充15


Bull New Energy Electric Vehicle Charging Station Manufacturer120KWCommercial DC Single and Double Gun New Energy Charging Pile for Cloud PlatformRefillCaution for Electric Charging Poles: Safety considerations: 1Do not place flammable, explosive, or combustible materials, chemicals, or flammable vapors near the charging station.2Keep the charger clean and dry. If dirty, wipe with a clean dry cloth. Absolutely do not touch the charging core with your hands while it is plugged in.3Absolutely no use of charging stations when the charger or charging cable is defective, cracked, worn, torn, or otherwise compromised. If any issues are found, please contact staff immediately.4Do not attempt to disassemble, repair, or modify the charging station. For any repair or modification needs, please contact staff. Improper handling may result in damage, leakage, or electrical hazards.5Absolutely no disconnection of the charger during charging to ensure personal and vehicle safety throughout the charging process.6In case of any abnormal conditions during use, immediately press the emergency stop button to cut off all input/output power supplies.7Please exercise caution when charging during rainy thunderstorms.8Children are advised not to approach or use the charging station during charging to avoid injury.9During charging, vehicles are prohibited from driving; charging can only be performed when stationary. For hybrid electric vehicles, please turn off the engine before charging.



询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13922770061

Back to Top