How to Install and Measure Membrane Structure Landscaping?_News Center Co., Ltd._How to Install and Measure Membrane Structure Landscaping?,Shandong Maijing Membrane Structure Engineering Co., Ltd._Shandong Maijing Membrane Structure Engineering Co., Ltd._Zhongshang 114 Industry Resources Network

Shandong Maijing Membrane Structure Engineering Co., Ltd.

Membrane Structure, Sewage Pool Covering, Membrane Structure Grandstand

Service Hotline:
18753656265  18753656265


Company Information

Location:Shandong/Weifang

会员级别:采商通4

身份认证:    

我的勋章:  通过中商114认证

Business Card

  • 公司名称Shandong Maijing Membrane Structure Engineering Co., Ltd.
  • 联 系 人朱磊 (先生)
  • 公司电话18753656265
  • 手机号码18753656265
  • Company Address10 Yewu Road, Yeyuan Town, Linqu County, Weifang City, Shandong Province

News Category
  • No Category

Contact Information
  • Contact person:朱磊
  • Telephone:18753656265
  • Mobile:18753656265
Home > News Center Co., Ltd. > How to Install and Measure Membrane Structure Landscaping?
News Center Co., Ltd.
How to Install and Measure Membrane Structure Landscaping?
Publish Time:2022-05-16        View Count:9        Return to List

How to install and measure membrane structure landscapes is a common question many friends ask our editor recently. Without further ado, let's dive right into the topic: how to install and measure landscape membrane structures. If you're interested, feel free to save this article and read it in detail at your convenience. Now, let's explore this article with the editor!

One, conduct a thorough inspection of the steel structure components processed in the factory. Pay attention to the welds and primer to ensure no defects. Treat the burrs on the edges of the steel structure to prevent them from scratching the membrane material during installation.

Prior to construction, personnel must inspect all equipment required for the construction process to ensure proper operation and prevent any disruptions due to equipment failures.

According to the design requirements and construction schedule, organize all necessary components and documentation for the construction.

Four, pre-job training is required for specialized trades such as welders, and only those who pass the assessment can be employed.

Prior to construction, measurement personnel should inspect the longitudinal and transverse axes, as well as the elevation of the embedded components, and meticulously record the inspection data. This serves as the basis for the construction team to adjust and align the steel structures. The measurement personnel should project the main arch and secondary arch onto the ground, and make measurement marks at each projection point.

Before unfolding the membrane of the landscape canopy, lay temporary fabric on the platform to protect the membrane material from damage and ensure its cleanliness. Strictly unfold the membrane in the predetermined sequence. Before opening the packaging, check the markings on the packaging to confirm the installation location, and unfold according to the marked direction, trying to minimize movement of the unfolded membrane within the site.

Seven, currently, the installation of tensile membrane structures largely employs the multi-point synchronous lifting method. This method modifies an already mature "lifting" technology to be used in the construction process of tensile membrane structures, a flexible structure. This process requires synchronization throughout. During the lifting, control the ascending speed and distance of each lifting point to ensure uniform force transmission across the membrane surface.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
18753656265