Key Points to Consider When Installing and Using Sand Washing Equipment_News Center Co., Ltd._Qingzhou Leding Environmental Protection Technology Co., Ltd.
欢迎来到Qingzhou Leding Environmental Protection Technology Co., Ltd.!
  • Sales Hotline:13792624567  13792624567


Company Information

Location:Shandong/Weifang

会员级别:采商通4

身份认证:    

我的勋章:  通过中商114认证

Business Card

  • 公司名称Qingzhou Leding Environmental Protection Technology Co., Ltd.
  • 联 系 人王庆善 (先生)
  • 公司电话13792624567
  • 手机号码13792624567
  • Company AddressQingzhou Huanglou Street Office, Masiong Village, South of Weifang City, Shandong Province

更多Product Classification Co., Ltd.
  • No Category

更多Contact Information
  • Contact person:王庆善
  • Telephone:13792624567
  • Mobile:13792624567
Home > News Center Co., Ltd. > Key Points to Consider When Installing and Using Sand Washing Equipment
News Center Co., Ltd.
Key Points to Consider When Installing and Using Sand Washing Equipment
Publish Time:2022-05-14        View Count:30        Return to List

The sand washing equipment is applied in various industries such as construction sites, sand and stone factories, and concrete dam sites of hydropower stations. It boasts simple structure, stable operation, high cleanliness, reasonable design, large processing capacity, low energy consumption, and suitability for working environments, making it the ideal choice for the replacement of sand washing equipment. To ensure the equipment brings good profits to users, the following points should be noted during installation and use:

The newly purchased sand washing equipment should be installed on a level concrete foundation and secured with anchor bolts.

Ensure the main body is perpendicular to the horizontal during installation.

3. After installation, inspect all bolts for looseness and ensure the main compartment door is securely fastened. If any are loose, please tighten them.

4. Configure power lines and control switches according to the power configuration of the sand washing equipment.

5. After the inspection is completed, proceed with an empty load test run. If the test run is normal, production can commence.

Before startup, inspect all lubrication points for grease, ensure that the connecting bolts are tightened, and that all spiral blades are securely fastened.

After starting the motor, wait until it runs smoothly before gradually adding the material.

Prior to shutdown, cease the addition of materials, and only after the contents in the box tank are fully drained can the motor be stopped.

9. Regularly inspect the spiral wear of the sand washing equipment and replace it promptly to avoid losses due to spiral damage.