Submersible In-Line Pump QJB-W3, 2-Year Warranty_SupplyPro Co., Ltd._Du'an Environmental Protection Equipment (Jiangsu) Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Du'an Environmental Protection Equipment (Jiangsu) Co., Ltd.

Environmental equipment, pumps, water treatment systems, mechanical accessori...

Consultation Hotline
025-57523831   13813381829

Product Categories

Contact Information
  • Contact person:李经理
  • Telephone:025-57523831
  • 邮件:63572853@qq.com
  • 传真:025-57523831
Home > SupplyPro Co., Ltd. > Submersible In-Line Pump QJB-W3, 2-Year Warranty
Submersible In-Line Pump QJB-W3, 2-Year Warranty
品牌: Duwan
Voltage:
Impeller Speed: 740 RPM
Current: 7.1A
单价: 888.00/Tai
最小起订Quantity: 1 Tai
供货总Quantity: 500 Tai
有效期至: 长期有效
最后更新: 2024-11-19 10:31
 
详细Info

Duwan Submersible Recirculation Pump QJB-W3, Two-Year Warranty

Jiangsu Du'an Environmental ProtectionQJB-WType DivingRecirculation pump performance and structure:

The submersible centrifugal pump with adjustable lift works continuously under full immersion conditions. The impeller is directly driven by an underwater motor.

Each internal recirculation pump should be equipped withAISI304 Stainless steel guide rodsAISI304 Stainless steel lifting rope for free ascent and maneuverability.

The internal recirculation pump can be raised and lowered, facilitating easy movement, inspection, and maintenance without the need for personnel to enter the pool. The sliding rod bracket, as an integral part of the mixed liquid recirculation pump, bears the entire weight and thrust generated by the pump, and this bracket must be capable of withstanding the thrust created by the mixed liquid recirculation pump. The stainless steel lifting rope provided should be sufficient to meet lifting requirements. It should be ensured that the mixed liquid recirculation pump, its accessories, and cables are20 The water level reaches 3 meters deep without any leakage, and it is equipped with the function of continuous diving. Each mixed liquid recirculation pump should be designed as a whole, with a sealed connection, and of submersible type. All exposed nuts, bolts, and washers are made of stainless steel.AISI316The sealing design of the main components of the blender should be metal-to-metal contact. The critical contact surfaces requiring waterproof sealing should be machined and fitted with two sets of nitrile or fluorinated rubber.O O-Ring, it allows rubber to fit between two surfacesO O-RingsO The four sides of the O-ring are tightly compressed.

All external parts of the submersible internal recirculation pump that come into contact with the liquid are made of304Stainless steel or316Stainless steel.

 


Raw Material Composition:

Shaft                                   Stainless Steel

叶 轮                                不锈钢

Shell                                 Stainless Steel

Fasteners                             Stainless Steel

Install System                           Stainless Steel

OO-Ring                                   Nitrile Rubber70

Mechanical Seal                                           Tungsten Carbide


Du'an Environmental ProtectionQJB-WSludge internal recirculation pump installation:

Jiangsu Du'an installs equipment strictly according to the drawings' specifications and recommendations, at the designated locations on the drawings. It should also provide the lubricants required for the operation during the manufacturer's recommended warranty period. The matching anchor bolts are supplied and installed by Du'an Environmental Protection and should comply with industry standards.

Concrete Foundation

Recirculating pump concrete foundation to be constructed by the owner. Duwan EnvironmentalQJB-WSludge Recirculation PumpTo ensure the correct foundation position. The concrete strength grade should meet the requirements for the installation and operation of the submersible recirculation pump, unless otherwise specified, the foundation bolts should be properly placed during grouting.

Factory painting

A.Before painting,QJB-WSludgeAll surface areas of the recirculation pump should be thoroughly cleaned and dried, removing oil, rust, dirt, and other surface contaminants.

B.All recirculating pumps, motors, and other driving equipment should be coated with an undercoat and finish paint in accordance with this specification at the factory. The surfaces that will come into direct contact with wastewater during operation should be reliably anti-corrosion treated.

Inspection and Testing

A.Overview

1.Prior to shipment from the factory, the owner has the right to inspect and test all equipment and materials in accordance with this specification.

2.Prior to shipment, a timely written notice should be sent to the owner to allow them to arrange for an inspection.

3Provide the owner with the necessary facilities for inspection and testing, including personnel, and ensure ample time is allocated for the inspection and testing.

4.All materials and equipment shall be inspected and tested according to the owner's requirements. Suppliers should anticipate that inspections and tests of materials and equipment may cause delays.

5.Jiangsu Du'an Environmental Protection's after-sales representative should provide on-site service to conduct installation inspections and equipment trial operations.

6.After the installation work and preparation for testing are completed, on-site testing can begin.

Duane Submersible Recirculation Pump: Pre-shipment Documentation Submission

The Jiangsu Du'an Environmental Protection Submersible Recirculation Pump must provide the following information (but not limited to these):

A.Detailed installation, operation, and maintenance manuals for equipment

B.Detailed equipment manual, including:

1.Manufacturing standards.

2.Detailed structural description, parts assembly diagram and assembly drawings.

3.Detailed dimensional drawings (installation dimensions).

4.All parts and materials list.

5.Detailed specifications or manuals, along with the design, for electrical control.

6.Equipment production and factory inspection certificates and records, as well as the equipment qualification certificate issued by the manufacturer.

C.Overall Site Plan

An overall plan showing the horizontal, vertical, and cross-sectional views of the internal recirculation pump and motor, including all control dimensions and required spacing for installation, operation, and maintenance.

D.Detailed drawing

1.Detailed installation diagrams for all assembled accessories of the internal recirculation pump and its operating components.

2.Detailed installation diagram showing the connection or welding of the internal recirculation pump to the foundation and foot bolts.

E.Detailed instructions for on-site installation methods.

F.On-site inspection, testing, and trial run procedures and records.

G.Packing List for Supplies


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

025-57523831