SQJB-1500 Double Curved Blender User Manual_News Center Co., Ltd._Du'an Environmental Protection Equipment (Jiangsu) Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Du'an Environmental Protection Equipment (Jiangsu) Co., Ltd.

Environmental equipment, pumps, water treatment systems, mechanical accessori...

Consultation Hotline
025-57523831   13813381829

News Category
  • No Category

Contact Information
  • Contact person:李经理
  • Telephone:025-57523831
  • 邮件:63572853@qq.com
  • 传真:025-57523831
Home > News Center Co., Ltd. > SQJB-1500 Double Curved Blender User Manual
News Center Co., Ltd.
SQJB-1500 Double Curved Blender User Manual
Publish Time:2024-03-18        View Count:10        Return to List


SQJB-1500 Double-Curved Blender Instruction Manual

1500mm impeller diameter

Gearbox减速机

304 Stainless Steel Drive Shaft

Gearbox减速机

Scope of Application  

Duwan Environmental SQJBThe Bi-curved Blender is our company's patented product. It is widely used in industries such as environmental protection, chemical, energy, and light industry, where solid-liquid-gas exchange of liquids is required. It is particularly suitable for mixing and blending in wastewater treatment processes, including coagulation ponds, regulating ponds, anaerobic ponds, aeration ponds, nitrification and denitrification ponds, and various corrosive media.

Two,Company News Brief: Structure Overview  

Jiangsu Du'an Environmental ProtectionSQJBTwin-surface agitator, comprising a reducer motor, vibration damping base, agitator shaft, twin-surface impeller, electrical control cabinet, and bridge架(用 Customers may provide their own (if applicable).

ThreeTransportation and Storage

 1. Mixing shafts and impellers must not be subjected to pressure or collision during transportation; they should be handled with lifting equipment, and the surface of the impeller should be protected from scratching. 2. When stored for long periods, avoid high temperatures and humidity. The mixing shaft should be suspended vertically, and the impeller should be placed on a flat surface to prevent deformation.

FourEquipmentInstallation

  1、Vertical BlenderThe bridge should be leveled, and the half-bridge uprights should be plumb. The anchor bolts and connection points should be sturdy and reliable.

2. Place the shock-absorbing bracket flat in the specified location on the bridge, align it horizontally, and then connect and secure it to the bridge.

The decelerating motor is mounted on the shock-absorbing base and securely connected.

4. Secure the impeller to the mixing shaft flange with bolts and tighten them.

 Step 5: Place the impeller and stirrer shaft into the tank, connect and secure the stirrer shaft to the reducer output shaft.

6、After the mixer is installed, the stirrer shaft must be perpendicular to the horizontal plane. The deviation should be less than1/1000, and not exceeding 5mm.

After installation, remove the motor rear cover and manually rotate the fan blades to check if the blender operates smoothly and normally. The swing deviation of the blending shaft should be less than 3/1000.

After powering on, observe the direction of the stirrer shaft rotation by pressing the button. The correct rotation direction, viewed from top to bottom, is counterclockwise. If not, swap the positions of any two power lines.

9. Electrical equipment installation must be conducted in accordance with national regulations and safety protocols.

FiveEquipmentOperation  

  Upon completion of the equipment installation, a trial run is required. Prior to the trial run, it is mandatory to inject approximately the volume of the pool into the pool itself.70% water content; Do not operate the equipment without water to avoid uneven stress on the stirrer shaft that could lead to bending. After the trial run, please ensure to check:

1、Are there any abnormal noises or temperature rise in the decelerating motor?

2. Is the motor current within the rated value range (brief overcurrent during startup is normal).

3、The swing condition of the agitator shaft.  In any of the aforementioned scenarios, should an abnormality arise, the cause must be identified and corrected. Note: Adjust the rotation direction of the mixer to correspond with the direction of the blade reinforcing ribs.

Six.EquipmentMaintenance and Service  

1、The new machine is now operational.1. The reducer oil should be changed every 200 to 300 hours, along with cleaning the internal oil residue. Subsequently, a replacement can be scheduled every six months to one year; for the use and maintenance of the reducer motor, refer to the manufacturer's instruction manual. 2. Regularly inspect the tightening nuts of the agitator shaft and all connecting bolts for looseness. 3. Regularly check the vibration of the agitator shaft. 4. Regularly inspect the rotating parts for any unusual sounds or temperature increases. 5. Regularly check for any abnormal changes in the current. All inspections should be documented, and in case of any anomalies, please contact our company.

Dual-curved mixer operational:

After the equipment installation is completed, a trial operation must be conducted. Prior to the trial operation, it is necessary to inject approximately the volume of the pool into the pond.70% water content, do not operate the equipment without water to prevent the stirring shaft from bending due to uneven force distribution. After a trial run, please check:

1、Are there any abnormal noises or temperature rises in the decelerating motor?

2. Is the motor current within the rated value range (short-term overcurrent during startup is normal).

3、TransmissionAxial swing conditions. 

Dual-Surface Blender Specifications:

Model

Impeller Diameter
(mm)

Rated Speed
(kw)

Service Scope
(Chi Kuan m)

Service Scope
(Pool Wide M)

Overall weight(kg)

Propeller Stainless Steel

Propeller fiberglass

SOJB500

500

40-250

0.75-1.5

1-3

320

300

SQJB1000

1000

30-80

1.1-2.2

2-5

700

500

SQJB1500

1500

30-60

1.5-3

3-6

850

600

SQJB2000

2000

20-42

2.2-3

6-14

1100

650

SQJB2500

2500

20-40

3-5.5

10-18

1200

700

SQJB3000

3000

20-30

4-7.5

12-22

1250

900


 Click submit means you agree to《Service terms》《Privacy policy》

025-57523831