Grouting Tube Waterstop Installation and Precautions_News Center Co., Ltd._Grouting Tube Waterstop Installation and Precautions,Shandong JinYou Engineering Materials Co., Ltd._Shandong JinYou Engineering Materials Co., Ltd._Zhongshang 114 Industry Resources Network
Shandong JinYou Engineering Materials Co., Ltd.

Manufacturing hollow anchor rods, hollow grouting anchor rods, grouting pipes, small conduits, steel pipes, and other metal products.

Service Hotline
13287045599


Company Information

Location:Shandong/Liaocheng

会员级别:采商通4

身份认证:

我的勋章:  通过中商114认证

Business Card

  • 公司名称Shandong JinYou Engineering Materials Co., Ltd.
  • 联 系 人曲经理 (先生)
  • 公司电话13287045599
  • 手机号码13287045599
  • Company AddressLiaocheng Economic and Technological Development Zone Daqu Industrial Park

News Category
  • No Category

Contact Information
  • Contact person:曲经理
  • Telephone:13287045599
Home > News Center Co., Ltd. > Grouting Tube Waterstop Installation and Precautions
News Center Co., Ltd.
Grouting Tube Waterstop Installation and Precautions
Publish Time:2022-01-20        View Count:12        Return to List

(1) Ensure the concrete interface for the waterstop is flat and dry. Clean off any debris, dirt, and loose materials before installation. Secure the waterstop in the predetermined installation location using steel nails or adhesive. However, the side with the grouting tube must be placed against the original concrete interface.

(2) During the connection of water-swelling gasket strips for grouting pipes, the parallel lap method is employed, ensuring no break points in the middle. The joints are reinforced with steel nails, and the pre-assembled grouting connection tubes on the gasket strips are then slipped over to connect to the other equal gasket strip for the two-way joint.

(3) One tee fitting is installed at approximately thirty meters based on the length of the installed waterstop. One end of the tee is inserted into the waterstop, while the other end is inserted into the grouting connection pipe. The T-shaped end should be inserted into the standby grouting to be ready for chemical grout injection in case of leakage through the gap.

(4) It is essential to securely bond the grouting connection pipes within the sealing strips to the tees, ensuring that the grouting tubes of the installed sealing strips are completely unobstructed. The spare grouting tube installed on the tee should be placed inward towards the interior wall.

Each box contains one bottle of grouting tube adhesive (used for bonding the grouting tube to the two-way and three-way connections on the water stopper), as well as one spare grouting tube for insertion into the interior wall connected to the three-way.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13287045599