A Brief Overview of Basic Operations for High-Voltage Direct Current Load Boxes_News Center Co., Ltd._Tianjin Rikate Aviation Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Tianjin Rikate Aviation Equipment Co., Ltd.

Aircraft, Helicopters | Aircraft Manufacturing | Aerospace Equipment Manufact...

13821934933
17611312792
 

News Category
  • No Category
Home > News Center Co., Ltd. > A Brief Overview of Basic Operations for High-Voltage Direct Current Load Boxes
News Center Co., Ltd.
A Brief Overview of Basic Operations for High-Voltage Direct Current Load Boxes
Publish Time:2023-05-25        View Count:37         Return to List

It can be used for fault current testing, enhancing the device's usability. For safe operation, we've also added a grounding terminal to its housing and securely connected it to the ground wire. For instance, with a 5kV withstand voltage, the output voltage is set between 0V and 650V. The high-voltage terminal is connected to the load, and after each switch is turned on, the withstand voltage output is gradually increased to understand the instrument's alarm. Prepare test data for each group, then calculate the average value, which is the breakdown current value. Note that a 0.5mA reading requires borrowing some resistors, but they should be串联 after our DC load box at 3MΩ, with a 100KΩ potentiometer for readings below 0.5mA, and a 100KΩ potentiometer for adjusting between 0.5-2mA and a 10KΩ potentiometer. Aviation ground power 2, 36V aviation power 1, 400Hz variable frequency power supply 7, 115/200V power supply 2, 27V DC power supply 5, 400Hz power supply 12, aviation power supply.

 Click submit means you agree to《Service terms》《Privacy policy》

13821934933