Load Box Wiring Principle_News Center Co., Ltd._Tianjin Rikate Aviation Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Tianjin Rikate Aviation Equipment Co., Ltd.

Aircraft, Helicopters | Aircraft Manufacturing | Aerospace Equipment Manufact...

13821934933
17611312792
 

News Category
  • No Category
Home > News Center Co., Ltd. > Load Box Wiring Principle
News Center Co., Ltd.
Load Box Wiring Principle
Publish Time:2023-05-25        View Count:6         Return to List

Load box voltage transformer field calibration: Connect the transformer according to the wiring diagram,串联 the load box between the secondary terminals a and x of the voltage transformer under test. Ensure that the load box grounding point is reliably grounded. Adjust the load box to the actual secondary load of the current transformer under test. Select the power factor positions of 0.8 and 1.0. Short-circuit and ground the secondary circuit of the voltage transformer. During the operation, ensure that the secondary winding of the voltage transformer has only one maintenance grounding point. The experimental wiring should be correct, and the secondary winding under test and other secondary windings must not be short-circuited. The inspection work must be carried out carefully and meticulously, with double-checking and familiarity with the performance of the testing equipment and methods. Therefore, we must strictly follow the work sheet and maintain all sections of the load box. Aviation ground power 2, 36V aviation power 1, 400HZ frequency converter power 7, 115/200V power 2, 27V DC power 5, 400HZ power 12, aviation power

 Click submit means you agree to《Service terms》《Privacy policy》

13821934933