Ensure the upper and lower frequency limits of the aviation power supply are confirmed before operation.
During operation with load, if an overcurrent maintenance action occurs, the acceleration and deceleration time should be appropriately extended.
During operation with a load, if the load inertia is significant, the acceleration and deceleration times should be extended.
Generally, parameter adjustments should be made during downtime.

If extending or reducing braking time does not eliminate the overvoltage issue, a braking unit should be added.





