Steel-lined PTFE Lined Storage Tank_SupplyPro Co., Ltd._Wuxi Huashun Anticorrosion Container Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
13921511789
 

Product Categories
  • No Category

Contact Information
  • Contact person:张总
  • Telephone:13921511789
  • Mobile:13921511789
  • Address:38 Luoyang North Road, Shuangmiao Village, Luoshi Town, Wuxi City, Huishan District
Home > SupplyPro Co., Ltd. > Steel-lined PTFE Lined Storage Tank
Steel-lined PTFE Lined Storage Tank
品牌: Hua Shi Shun
Origin: Wuxi
Custom Processing: Is
Performance: Corrosion-resistant, leak-proof, and peel-resistant
单价: 电议
最小起订Quantity:
供货总Quantity:
有效期至: 长期有效
最后更新: 2025-03-04 14:03
 
详细Info

Stainless steel lined PTFE inner-lining storage tanks, vertical and horizontal agitator tanks

I. Pretreatment

The inner surface of the lining equipment is degreased with solvents and dried, followed by sandblasting with 46# steel shot. The sandblasted surface is then cleaned and dried with trichloroethylene.

Surface Paint Treatment

Section 3: Adhesive Coatings

Apply a uniform layer of special adhesive to the inner surface of the product, and also coat the backside of the composite board with adhesive. Then, position and adhere the composite board accordingly.

Four, Paste

After aligning the adhesive-coated composite board, apply it first, then perform local heating and rolling to expel air trapped in between, ensuring a tighter fit for the 3mm or 4mm PTFE (Teflon) sheeting.

Five: Weld Seam

Once the composite panels are fully bonded, use a professional notching machine to create "V" shaped long grooves at the junction of the two panels, and clean out any debris from the gaps.

Welding

Utilize imported high-temperature welding torches with Φ3.5mm PFA welding rods. Weld the two composite panels together in the middle of the grooved seam, ensuring there are no impurities, bubbles, or missed welds. After the overall welding is complete, use a pinhole tester to test with 15,000 volts to check for any microholes and make necessary repairs. Upon completion of the inspection, use an imported groove planer to flatten any protruding welding rods on the composite panel's top surface. Then, reinforce the original welding rods with a 20mm-wide welding strip to ensure the welds are secure and free of microholes. Finally, test for pinholes using 30,000 volts after welding to further confirm the welding quality.

Seven, Inspection