Explosion-proof fire fighting training tower_SupplyPro Co., Ltd._Hengshui Lin Dong Communication Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Hengshui Lin Dong Communication Equipment Co., Ltd.

Steel Chimneys | Stainless Steel Chimneys | Chimney Towers | Lightning Protec...

Consultation Hotline
0318-4431186  13363186636

Product Categories
Home > SupplyPro Co., Ltd. > Explosion-proof fire fighting training tower
Explosion-proof fire fighting training tower
品牌: Lin Dong
Brand: Lindong
Origin: Hebei Hengshui
Shipping Location: Jing County
单价: 5300.00/ton
最小起订Quantity: 1 ton
供货总Quantity: 18000 ton
有效期至: 长期有效
最后更新: 2022-05-14 08:56
 
详细Info

New climbing training tower 1. The size of the training tower window is 1.2m x 1.8m, and the window must be no less than 0.65m from the tower edge. The window sill width is 0.35m.

Window sill board thickness: 0.05 (protruding 5 cm from the tower wall), the height from the sill to the ground level of each floor is 0.8 meters, the floor height is 3.5 meters, and it should have a clear width of not less than...

Staircase with a height under 0.9 meters, featuring a handrail tube diameter of not less than 0.026 meters. The handrail height of the inner staircase is 1.1 meters. 2. On each floor of the training tower, an inner handrail should be installed.

Please install a platform not less than 1.5 meters wide, with a railing on the top level. 3. Set up an outdoor fire ladder in the training tower. The ladder should extend to the top of the tower and should not be narrower than necessary.

At 50 cm. Training Tower Description: 1. Mainly composed of (1) simulated windows, (2) floor partitions, (3) rear supports, (4) observation, and command platform framework.

Consisting of the main steel structural frame and other components. Floor partitions (steel plates) are installed between the upper and lower adjacent simulated windows. 2. Below the rear of the tower, there is a partition with the model.

Corresponding rear frame for the simulated window. 3. The simulated window, floor partition, rear frame, and main frame are bolted together for integration. 4. The layers are interconnected.

Each floor is connected by stairs. 5. The upper part of the tower is equipped with observation and command platforms.


询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13363186636