After the construction of the plastic track is completed, it should undergo an inspection. During the inspection, we should pay attention to the following points:
Based on the climate conditions, humidity, temperature, wind, etc., at the construction site, inspect the condition of the ground foundation, ensuring that asphalt and concrete foundations are properly cleaned.
2. Inspect for bubbling on the runway surface, verify that the mixture materials meet current national standards, and ensure environmental friendliness and healthiness, as these are prerequisites for the runway's long-term usability.
Ensure all engineering documents are complete, verify the ground is level, and assess the integrity of the site. Only upon completion of all inspections can departure be made.