Storage Requirements for Hengli Spring Hangers and Supports_News Center Co., Ltd._Cangzhou Hairen Pipeline Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Cangzhou Hairen Pipeline Equipment Co., Ltd.

Manufacture and sell pipeline equipment, series of pipe fittings, factory-int...

13393396168 13731737160
 
Product Classification Co., Ltd.
  • No Category
Home > News Center Co., Ltd. > Storage Requirements for Hengli Spring Hangers and Supports
News Center Co., Ltd.
Storage Requirements for Hengli Spring Hangers and Supports
Publish Time:2022-07-23        View Count:84         Return to List

Spring support hangers product storage should comply with the following requirements:

Store in a well-ventilated, dry storage room.

b. Components should be stored on shelves according to the same model and specification; when arranged on a pallet, they should be stacked neatly, and the height should not exceed 5 layers or 1 meter.

c., moisture-proof membranes should be laid on the ground, with dry wooden strips (or wooden frames, bamboo plywood, etc.) as supports. Different types of channel steel should be stacked separately; unsealed channel steel should be placed between dry wooden strips.

The channel stacking height should not be less than 1.0 meter and should be equipped with anti-overturning measures and warning signs.

Cutting rods for C-shaped steel and full-threaded bolts should comply with the following relevant regulations:

Ensure verticality of the cross-section during cutting.

When cutting with the C channel opening facing downward, cut to avoid deformation.

c. The burrs at the cutting end should be ground smooth and promptly removed, along with the iron屑 and powder that have been adsorbed.

d. Cut sections should be protected...

Construction equipment should be completed, measurement tools should be verified for certificates, and used during this period.

Before installing spring hangers, it is essential to clearly define the scope of construction project management, and the relevant research work should meet the technical development requirements of actual construction and the installation of spring hangers.

 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13393396168

Back to Top