Structural Steel Installation_Excellence in Quality Co._Tianjin Guihuo Construction Group Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Tianjin Guihuo Construction Group Co., Ltd.

Structural steel fabrication, construction, installation,...

18526554823
 

Product Categories
Home > Excellence in Quality Co. > Structural Steel Installation
Structural Steel Installation
品牌: Gaohe Construction
Brand: Precious Harmony Construction
Compressive Strength: Strong
Application: Good shock resistance
单价: 2000.00/ton
最小起订Quantity: 1 ton
供货总Quantity: 999 ton
有效期至: 长期有效
最后更新: 2022-10-28 16:09
 
详细Info

Single-layer steel structural projects should adopt a segmented installation method when formulating the installation technical plan. The installation of single-layer steel structures is recommended to use an integrated installation method. The installation of multi-layer steel structures generally employs an integrated installation method.

Single-layer steel structure installation

Steel column installation

Steel columns should be hoisted using single-point straight lifting ties, aligning the base bolts upon reaching the designated position and slowly lowering. After positioning, tighten the nuts to temporarily secure the column, adjusting its plane position and verticality; upon correction, retighten the nuts, weld the column base plate using shims, and then secure the base with grout.

Steel crane beam installation

The crane beam is secured with two-point binding. During lifting, the aerial position of the components is controlled by a slider for easy alignment and collision avoidance. Once temporarily secured, the crane beam's verticality, elevation, and position along the longitudinal and transverse axes should be corrected.

Roofing System Installation

The truss installation should be conducted after the pillars have been calibrated and secured; the roof system can be hoisted after the expansion assembly, with the expansion assembly units forming a spatial structure of certain rigidity. The installation of rafters and other components should be carried out after the truss has been adjusted and positioned.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

18526554823