How to Ensure Quality, Effectiveness, Safety, and Preventive Measures in Fangmu Multi-Slice Saws' Operation_News Center Co., Ltd._Xingtai Fuyulai Machinery Factory 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Xingtai Fuyulai Machinery Factory

Woodworking machinery, food machinery, construction machinery production and ...

Consultation Hotline
19912028668

Product Categories

Contact Information
  • Contact person:葛同辉
  • Telephone:19912028668
  • Mobile:19912028668
Home > News Center Co., Ltd. > How to Ensure Quality, Effectiveness, Safety, and Preventive Measures in Fangmu Multi-Slice Saws' Operation
News Center Co., Ltd.
How to Ensure Quality, Effectiveness, Safety, and Preventive Measures in Fangmu Multi-Slice Saws' Operation
Publish Time:2023-12-16        View Count:18        Return to List

The Fangmu multi-blade saw features left and right teeth with wide applications, offering fast cutting speeds and relatively simple sharpening. It is suitable for cutting various soft and hard solid wood profiles, particleboard, plywood, and more. The left and right teeth equipped with anti-rebound protection teeth are known as dovetail teeth, ideal for longitudinal cutting of boards with knots. The left and right teeth with a negative front angle, due to their sharp blades and high-quality cutting, are commonly used for sawing veneer sheets.

We often overlook the safety operation procedures for multi-blade saws in our daily lives; however, it's crucial that Zhonghao Woodworking Machinery analyzes these safety procedures as well.

1. Adhere to regulations and properly wear personal protective equipment. Clear any obstructions around the work area. Connect the power source and open the dust removal valve.

2. Process the wood planks to the specified dimensions and adjust the number of saw blades, as well as the spacing between them.

3. Upon reaching the high-speed setting for the blade motor, turn on the conveyor belt motor. Do not start both the blade and conveyor belt motors simultaneously to prevent a sudden increase in current that could damage the electrical equipment.

Upon completion of the multi-blade saw operation, disconnect the power, close the dust extraction pipe valve, wipe down the equipment, tidy up the work environment, arrange the production pieces neatly, dispose of the chips, and ensure a clean working environment before leaving.

  

 Click submit means you agree to《Service terms》《Privacy policy》

19912028668