Construction Process of Silicon PU Courts Under Normal Conditions_News Center Co., Ltd._Cangzhou Shengxing Sports Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Cangzhou Shengxing Sports Equipment Co., Ltd.

Sports Equipment, Outdoor Fitness Equipment, Indoor Fitness Equipment, EPDM R...

Consultation Phone:

18730735577

  
News Category
  • No Category
home > News Center Co., Ltd. > Construction Process of Silicon PU Courts Under Normal Conditions
News Center Co., Ltd.
Construction Process of Silicon PU Courts Under Normal Conditions
Publish Time:2022-05-09        View Count:23         Return to List

The new generation of silicone PU sports courts is an environmentally friendly flooring that is indispensable in sports venues. With a lifespan of over ten years, the surface of the silicone PU court can still experience discoloration, powdering, delamination, cracking, and bubbling due to climate or improper use. These issues directly affect the use of the sports venue. When such problems arise, it becomes particularly important to properly repair the damaged silicone PU court.

The construction process for a silicone PU court typically includes: preserving the elastic layer, preparing the subgrade; using a grinder to remove all fallen surface layers and scrape them off. Then, clean the subgrade. Primer; after preparing the subgrade, apply a layer of primer to form a sealed layer. Elastic layer; apply the silicone PU elastic material using a toothed trowel to the subgrade, each coat being 2mm thick, with the spacing between coats based on the previous one drying. Continue until the desired thickness is achieved. Topcoat; after mixing the silicone PU paint proportionally, apply it with a roller in two layers, which has strong resistance to weathering and UV radiation, making the court surface look vibrant and attractive. Use silicone PU line paint to mark the standard court lines. After long-term use, if the surface of the silicone PU court shows phenomena such as powdering, falling off, and bubbling, don't panic. Generally, applying a 3.0mm PU or 3.0mm silicone PU topcoat over the powdered and fallen areas is sufficient.

The construction process for a Silicon PU court typically includes: preserving the elastic layer, preparing the subgrade; using a grinder to remove all fallen surface layers and scrape them off. Then, clean the subgrade. Primer; after preparing the subgrade, apply a layer of primer to form a sealed layer. Elastic layer; use a toothed trowel to spread the Silicon PU elastic material on the subgrade, with each coat being 2mm thick, and the time between coats is based on the previous one drying. Continue until the desired thickness is achieved. Topcoat; after mixing the Silicon PU paint in proportion, apply two layers with a roller, which has strong resistance to weathering and UV radiation, making the court surface look vibrant and pleasing to the eye.


b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
18730735577

Back to Top