What to Pay Attention to When Conducting Ground Grouting Reinforcement_News Center Co., Ltd._Chongqing Fengji Construction Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Chongqing Fengji Construction Engineering Co., Ltd.

A variety of construction activities, engineering surveying for construction ...

Consultation Hotline
13908379117  13983751695

Product Categories
Home > News Center Co., Ltd. > What to Pay Attention to When Conducting Ground Grouting Reinforcement
News Center Co., Ltd.
What to Pay Attention to When Conducting Ground Grouting Reinforcement
Publish Time:2022-03-28        View Count:14        Return to List

Use with caution in collapsible clay soil layers.
b.浆注压力 should not be excessive; it should be sufficient to split, compact, and infiltrate the soil layers (generally controlled within 1.5 MPa). Excessive pressure can lead to the uplifting of the overlying soil layers and the upward migration of the slurry.
c. Prior to solidification, the slurry acts as an additional external load, and grouting disrupts the original bearing layer, thus increasing the likelihood of additional settlement. For sensitive structures, it is recommended to use a staggered grouting method with one or more holes skipped, with an interval of 3 days or more.
d. For cobblestone layers or soil with high dynamic water pressure, liquid should be mixed with a rapid-set accelerator, or use intermittent grouting.

 Click submit means you agree to《Service terms》《Privacy policy》

13983751695