Chuanjin New Material Technology Co., Ltd. is a comprehensive enterprise integrating the research and development, production, design, sales, and installation of seismic bracing products. We provide clients with a one-stop technical solution that includes seismic bracing scheme design, technical consultation, piping system design, BIM application, and pipeline installation. The company boasts a professional technical team, offering clients specialized technical solutions for seismic bracing and high-quality products.
Seismic bracing pipe installation on-site is divided into lateral and bidirectional. The lateral seismic bracing drawing number is CJS-Pipe Diameter-T, and the bidirectional seismic bracing drawing number is CJS-Pipe Diameter-TL. The general project construction period is 15 to 30 days, please arrange the construction period accordingly.








