Confirm any changes in obstacles or reserved locations along the busbar channel design direction.
2. Fabricating and installing supports at the busway installation site.
3. Conduct insulation testing prior to installation.
4. Hoisting busbars and inter-section connections;
5. Correct, adjust, and inspect initial installations.
6. Connect the busway with the power distribution equipment (circuit breakers, transformers, etc.).
7. Connector boxes and other devices
8. Electrical inspections conducted on the busbar slot system.